Skip to main content

Ringwood is Readi

UK maintenance company Ringway says that it has invested in Readi Barriers to help improve the management of road closures and reduce the number of incidents with the travelling public. Several automatic Readi Barrier systems have been trialled as an alternative way of enforcing road closures at sites in the English counties of North Yorkshire, Hertfordshire, Cheshire West, the East Midlands and Cambridgeshire.
September 1, 2017 Read time: 2 mins

UK maintenance company 2393 Ringway says that it has invested in Readi Barriers to help improve the management of road closures and reduce the number of incidents with the travelling public.

Several automatic Readi 165 Barrier systems have been trialled as an alternative way of enforcing road closures at sites in the English counties of North Yorkshire, Hertfordshire, Cheshire West, the East Midlands and Cambridgeshire.

Ringway said that the implementation follows an incident where a member of the public drove straight through a road closure.

A system takes just two people to manoeuvre the component parts and assemble the barrier at the site entrance. The barriers can be operated remotely up to 20m away. However, a gateman is still required on some sites to facilitate access to certain areas of the site.

Ringway said that it has found Readi Barriers far more effective than signs and cones when it comes to deterring the public. Most people approach, see the barriers and do not stop to enquire, instead they turn around and go on their way, said Richard Whitaker, Ringway’s hub and programme manager.

“The feedback from our people on the North Yorkshire scheme has been very positive. Our frontline staff are well trained to deal with motorists who object to access controls, but this solution removes that flash point,” said Whitaker.

Ringway is part of 3281 Eurovia UK, a wholly owned subsidiary of Eurovia which in turn is part of 5177 VINCI.

For more information on companies in this article

Related Content

  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the
  • Kenya port suspension bridge project makes progress
    January 15, 2019
    A new suspension bridge in Kenya’s key port city, Mombasa, will help unlock potential – Shem Oirere reports Plans for the construction of a US$200 million suspension bridge in Kenya heva moved a notch higher. The country's urban roads agency recently announced the shortlisting of three bidders for the design, finance, construct, operate, maintain and transfer public private partnership (PPP) contract model. Kenya Urban Roads Authority (KURA) is a state agency that manages, develops, rehabilitates and mai
  • Digital cameras and VMS improve London and Scottish road safety
    March 18, 2016
    London and Scotland are using VMS and digital cameras to successfully lower road deaths. Road safety measures such as variable message signs (VMS) and digital cameras have boosted road safety in the UK capital London and also in the Scottish Highlands. And the systems need not be a drain on electricity supplies. Full matrix driver information signs from SWARCO Traffic, one of the UK’s leading traffic management technology providers, are being installed for the first time across the Transport for London (TfL
  • Super paving with Aggregate Industries’ SuperThin
    February 21, 2019
    Aggregate Industries’ contracting division recently laid a total of 1,800 tonnes of an ultra-low noise asphalt at Brampton Hut Services in Huntingdon in one weekend. Section 1 of Highways England’s A14 Cambridge-to-Huntingdon Improvement Scheme will see 21km of the road upgraded to three lanes in each direction and is expected to cut journey times by up to 20 minutes. The pavement works at Brampton Hut motorway services specified minimum sound level requirements of -7.5db (A). The limits are designed