Skip to main content

Ringwood is Readi

UK maintenance company Ringway says that it has invested in Readi Barriers to help improve the management of road closures and reduce the number of incidents with the travelling public. Several automatic Readi Barrier systems have been trialled as an alternative way of enforcing road closures at sites in the English counties of North Yorkshire, Hertfordshire, Cheshire West, the East Midlands and Cambridgeshire.
September 1, 2017 Read time: 2 mins

UK maintenance company 2393 Ringway says that it has invested in Readi Barriers to help improve the management of road closures and reduce the number of incidents with the travelling public.

Several automatic Readi 165 Barrier systems have been trialled as an alternative way of enforcing road closures at sites in the English counties of North Yorkshire, Hertfordshire, Cheshire West, the East Midlands and Cambridgeshire.

Ringway said that the implementation follows an incident where a member of the public drove straight through a road closure.

A system takes just two people to manoeuvre the component parts and assemble the barrier at the site entrance. The barriers can be operated remotely up to 20m away. However, a gateman is still required on some sites to facilitate access to certain areas of the site.

Ringway said that it has found Readi Barriers far more effective than signs and cones when it comes to deterring the public. Most people approach, see the barriers and do not stop to enquire, instead they turn around and go on their way, said Richard Whitaker, Ringway’s hub and programme manager.

“The feedback from our people on the North Yorkshire scheme has been very positive. Our frontline staff are well trained to deal with motorists who object to access controls, but this solution removes that flash point,” said Whitaker.

Ringway is part of 3281 Eurovia UK, a wholly owned subsidiary of Eurovia which in turn is part of 5177 VINCI.

For more information on companies in this article

Related Content

  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Improving safety for cyclists
    November 15, 2013
    New systems in development for protecting vulnerable road users - Mike Woof writes In many European countries the number of people using bicycles for commuting are increasing. This is being actively encouraged by city authorities as it offers an effective way to reduce traffic congestion, lower exhaust emissions and also improve public health. The Netherlands and Denmark have long had high percentages of commuters opting to use bicycles and other European countries are looking to capitalise on the experienc
  • Elevated thinking
    July 30, 2019
    A Swiss-designed system for the diversion of traffic away from road maintenance crews could be revolutionary, reports David Arminas Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from bridge and road maintenance crews. The federal highways agency - FEDRO - will be asking manufacturers of heavy equipment to submit bids starting this summer for the Astra Bridge system. The system will be two lanes wide and include ramp sections at e
  • Uretek delivers voided soils treatment for UK’s M3 Smart Motorway
    February 8, 2018
    Ground engineering specialist Uretek has been treating voided soils as part of maintenance following completion of the UK’s M3 Smart Motorway project. Work is between junctions 2 and 4a where Uretek has provided a non-disruptive alternative to conventional underpinning to solve foundation subsidence problems. The focus for Uretek is an old 900mm corrugated pipe, 73m long. The old pipe has had a new 700mm pipe inserted inside. However, the old pipe is rusting and rapidly deteriorating.