Skip to main content

Rebloc’s construction site end terminal

By David Arminas September 19, 2024 Read time: 2 mins
Redirecting instead of stopping: Rebloc’s tested end terminal element for temporary vehicle restraint systems

Rebloc has developed an end-terminal for performance class P2A barriers with an impact severity level A designed specifically for traffic management on construction sites.

The end terminal has been successfully tested according to ENV 1317-4 and is particularly suitable for use in combination with temporary vehicle restraint systems.

The company, based in Austria, said that a standout feature of the system is the unanchored setup and the narrow width of only 240mm. The width matches exactly with the width of the connected temporary Rebloc barrier.

Additionally, the end terminal element is integrated into the overall system via the coupling element in a system-compliant manner. It can be used at the beginning and end of the vehicle restraint system without any anchoring into the ground.

Thanks to the successful 80km/h impact tests, the end terminal is ideal for use in construction areas, according to the company. The key feature is the redirecting functionality of the end terminal, which prevents the sudden stopping of the impacting vehicle and gives the following road users enough reaction time.

In congested traffic scenarios where traffic has no alternative routes, the feature is of essential preventing rear-end collisions. This is especially significant considering the official legal distance regulations and potential liability issues.

It has been successfully crash-tested with a connected temporary T3/W1 system, with no additional anchoring into the ground required. Meanwhile, the narrow width of only 240mm is compliant with the temporary Rebloc vehicle restraint systems. Importantly, it requires low maintenance and is quickly repaired after an impact
 

For more information on companies in this article

Related Content

  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s
  • Efficient road maintenance with Simex
    October 1, 2022

    Simex at Bauma Munich from 24 to 30 October, Hall C5, Booth 325.

    Bauma Munich – the most anticipated trade fair event in terms of strategic importance, turnout, new product launches and media impact for the earthmoving sector – has always been an opportunity for Simex to show to its partners and users its technical quality. The ability to innovate and do research, combining the new models in the range with new technological concepts, it’s the Simex way to outline the paths to be followed in the future.

  • Improve highway barriers to cope with higher speed
    February 24, 2012
    The UK association Britpave, the British In-situ Concrete Paving Association group, is keen to ensure that the country’s major highways will be able to cope with proposed speed limit increases. According to Britpave much of the UK motorway central reservation barriers may not be fit-for-purpose if the speed limit is increased from112-128km/h (70-80mph) as proposed recently.
  • New business cases for the deployment of automated vehicles in transport
    November 25, 2020
    Adapting roadway infrastructure to the needs and opportunities of a rapidly automating vehicle fleet remains a pressing issue for government agencies worldwide.