Skip to main content

REBLOC barriers for Rheinbrücke Leverkusen

Construction of the vehicle restraint system for the new Rheinbrücke A1 Leverkusen (bridge) in Germany was a challenge, according to REBLOC, maker of the system.
July 26, 2024 Read time: 3 mins
The bridge, part of the A1, and the access ramps are equipped with the REBLOC 100 SF(P) H4b/W4 system (image courtesy REBLOC)

The new Rheinbrücke A1 Leverkusen is part of a major traffic junction in Germany. The ambitious project includes the replacement of the Leverkusen Rheinbrücke as well as the expansion of the A1 motorway between Cologne-Niehl and the Leverkusen-West motorway junction.

At the same time, the bridge structures at the Leverkusen-West motorway junction are also being comprehensively renewed.

Replacement of the old Rheinbrücke consists of two individual, parallell-running bridge structures. The first part of the new construction was built directly north of the existing bridge.

Since February this year, traffic has been flowing over the new section. Before construction of the second bridge begins, the old Rheinbrücke will be demolished.

In the final state, both bridges together will provide eight continuous lanes - four in each direction. In addition, the entrances and exits on both sides of the Rhine River - both at the Leverkusen-West and the Cologne-Niehl junction – will lead onto and off the bridge with dual lanes. This will result in up to 12 lanes.

Moreover, 3.25m wide bicycle and pedestrian paths are planned for both sides, which are separated from the traffic lanes by noise barriers. The Rhine flows under the bridge as the main traffic artery for inland shipping. There is much to protect and the conditions are demanding.

Challenges and innovation

The entire construction project places high demands on the performance of the vehicle restraint systems - VRS. The bridge itself, with a steel cap as an orthotropic plate with a thin-layer coating as corrosion protection, requires a specially tailored VRS concept. Any type of anchorage into this steel cap leads to problems in construction execution as well as in the further operation and potentially necessary repairs.

However, the challenges go far beyond construction of the bridge. Large parts of the route lie directly in the sealing of a landfill, which places high demands on the VRS. In many areas, an anchorage into the ground is not allowed. At the same time, there is little space available for the effective range of the VRS

For the Rheinbrücke, the highest containment level H4b is required for the access ramps and parts of the landfill sealing. Therefore, the bridge itself and the access ramps are equipped with the REBLOC 100 SF(P) H4b/W4 system.

Meanwhile, the areas with the landfill drainage channels and noise barriers are also secured by this system. In areas, where minimal ground anchorage is allowed, the REBLOC 84XEAL H2/W1 system with an embedding depth of 40mm in asphalt, is used.

REBLOC precast concrete VRS

The chosen precast concrete VRS proves to be the ideal solution for the whole area. It secures the entire route continuously with tested and approved systems and transitions. The elements do not only offer visual appeal but also exceptional resistant to impacts - most minor accidents do not require any repairs.

An example of this is the conducted TB11 test - car weighing 900kg, traveling at 100km/h with a 20° impact angle. This did not cause any damage to the safety barrier. In addition, the unanchored H4b wall on the steel cap ensures the protection of the cap even when severely impacted.

As well, in case of a severe impact, damaged elements can be replaced quickly and easily at any time of the year independent of the weather.

The completion of the first new Rheinbrücke marks a milestone for the infrastructure in North Rhine-Westphalia. The new Rheinbrücke A1 Leverkusen will not only improve traffic flow but also strengthen the mobility and economy of the region sustainably. The upcoming progress of this impressive project remains exciting.

For more information on companies in this article

Related Content

  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division
  • Upgrade for Medieval bridge
    February 29, 2012
    One of the most demanding and challenging impressed current cathodic protection (ICCP) projects ever undertaken by specialist main contractor Concrete Repairs Ltd (CRL) is being carried out on Bideford Longbridge in County Devon, UK. The 24-span medieval masonry arch bridge spans 190m over the tidal estuary of the River Torridge.
  • Brokk offers painless bridge work
    February 10, 2020
    Peter Bigwood* makes the case for using remote-controlled demolition machines to demolish bridge decks
  • Spreading knowledge on European standards beyond Europe
    October 8, 2015
    Europe is a global leader in road safety. It has an average of 50 traffic fatalities/million population, half that of the equivalent figure for the USA While there is no magical formula for improving road safety, it is possible to observe a positive correlation between the advent of performance-based standards for essential road equipment and the impressive reduction in road fatalities that Europe has seen since 2001, a drop of 50%.