Skip to main content

A Promax SP60 is hard at work for Yimtas Group in Turkey

Yimtas A.S. Group, based in Turkey, reports that it has produced 1,600 units of the preformed READYMARK thermoplastic road marking signs for the Turkish market since October. Yimtas was set up in 1980 to import products for use in the domestic production of road and guardrail safety barriers, traffic signs, thermoplastic road markings, component road markings as well as preformed thermoplastic READYMARK road signs. The company also has CE certificates approval.
May 9, 2016 Read time: 2 mins

8422 Yimtas A.S. Group, based in Turkey, reports that it has produced 1,600 units of the preformed READYMARK thermoplastic road marking signs for the Turkish market since October.

Yimtas was set up in 1980 to import products for use in the domestic production of road and guardrail safety barriers, traffic signs, thermoplastic road markings, component road markings as well as preformed thermoplastic READYMARK road signs. The company also has CE certificates approval.

The group’s manufacturing facility in the north-eastern Turkish city of Duzce, has 7,000m2 of closed manufacturing space and around 17,000m2 of open area.

Annual production capacity is 20,000tonnes of guardrail safety barriers, 3,500tonnes thermoplastic road markings, 3,500 units of preformed READYMARK thermoplastic road signs as well as 3,000tonnes of two-component road markings signs.

The company, working with the Danish manufacturer 2445 Promax Industries, has also produced 4,800tonnes of thermoplastic road marking paints since May 2015.

Also since May, Yimtas has been using the SP60 preformed thermoplastic sheets production plant from the Danish firm Promax. The SP60 can manufacture thermoplastic sheets for horizontal road signs, with production capacity of 140 sheets per hour.
Promax will install the plant within 10 working days in a customer’s area already fitted out with water pipes and lifting equipment. Training at customer’s facility is included, including the necessary thermoplastic formulations.

Quality control and thermoplastic development is done in close corporation with laboratory manager and on sight fully equipped thermoplastic laboratory.

Running the factory on full capacity requires four people: feeding material, controlling application, water cutting, and finally the collecting, packing and transportation of product to storage facilities.

For more information on companies in this article

Related Content

  • Accelera in JV for battery production in US
    September 13, 2023
    Accelera, part of engine maker Cummins, along with Daimler Truck and PACCAR will each own 30% of the joint venture, with Chinese battery manufacturer EVE Energy having 10%.
  • Concrete plant innovations coming to market
    December 12, 2022
    An array of advanced technologies are now coming to market for the concrete plant segment. Manufacturers are developing new systems that offer rewards in output quality and productivity, while also benefiting from sophisticated systems that allow gains in material logistics
  • Sandvik’s Korean roots
    June 14, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.
  • Sandvik’s Korean roots
    June 13, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.