Skip to main content

A Promax SP60 is hard at work for Yimtas Group in Turkey

Yimtas A.S. Group, based in Turkey, reports that it has produced 1,600 units of the preformed READYMARK thermoplastic road marking signs for the Turkish market since October. Yimtas was set up in 1980 to import products for use in the domestic production of road and guardrail safety barriers, traffic signs, thermoplastic road markings, component road markings as well as preformed thermoplastic READYMARK road signs. The company also has CE certificates approval.
May 9, 2016 Read time: 2 mins

8422 Yimtas A.S. Group, based in Turkey, reports that it has produced 1,600 units of the preformed READYMARK thermoplastic road marking signs for the Turkish market since October.

Yimtas was set up in 1980 to import products for use in the domestic production of road and guardrail safety barriers, traffic signs, thermoplastic road markings, component road markings as well as preformed thermoplastic READYMARK road signs. The company also has CE certificates approval.

The group’s manufacturing facility in the north-eastern Turkish city of Duzce, has 7,000m2 of closed manufacturing space and around 17,000m2 of open area.

Annual production capacity is 20,000tonnes of guardrail safety barriers, 3,500tonnes thermoplastic road markings, 3,500 units of preformed READYMARK thermoplastic road signs as well as 3,000tonnes of two-component road markings signs.

The company, working with the Danish manufacturer 2445 Promax Industries, has also produced 4,800tonnes of thermoplastic road marking paints since May 2015.

Also since May, Yimtas has been using the SP60 preformed thermoplastic sheets production plant from the Danish firm Promax. The SP60 can manufacture thermoplastic sheets for horizontal road signs, with production capacity of 140 sheets per hour.
Promax will install the plant within 10 working days in a customer’s area already fitted out with water pipes and lifting equipment. Training at customer’s facility is included, including the necessary thermoplastic formulations.

Quality control and thermoplastic development is done in close corporation with laboratory manager and on sight fully equipped thermoplastic laboratory.

Running the factory on full capacity requires four people: feeding material, controlling application, water cutting, and finally the collecting, packing and transportation of product to storage facilities.

For more information on companies in this article

Related Content

  • When the rain comes
    July 18, 2012
    Statistics show that wet weather and the dark is not the best mix for driving, but road markings offer a safety solution While good road markings are essential any time of the day, it is perhaps at night when roads are wet that they can offer extra guidance. Statistics are said to reveal that an estimated 50% of all accidents happen during the night when it rains but such conditions occur only 10% of the time and when there are usually less vehicles on the road. Indeed, at the 1st Road Marking Symposium hel
  • Asphalt advances and industry innovations in paving
    May 20, 2014
    Asphalt paving technology continues to develop, benefiting from new technologies and new diesel engines - Mike Woof reports The asphalt paving equipment market is seeing the introduction of new low emission engines that will meet the Tier 4 Final regulations for Europe and North America. These have required some major engineering changes, with firms now having to install bulky exhaust after-treatment systems and additional cooling for engines and turbos.
  • Tertu’s T40 guardrail passes Chinese certification
    April 19, 2018
    Tertu reports that its T40 guardrail is the first European steel-backed timber safety barrier to be certified to Chinese standard JTG B05-01 -2013 (level A) The T40 barrier recently passed a crash-test programme at the Beijing Shenhuada laboratory. This certification is an essential step for the development of the company’s business in China, according to the French manufacturer, which will be at Intertraffic in Amsterdam this month. The barrier system consists of two half-logs 22cm in diameter and ei
  • Runway rebuild for key Bulgarian airport
    August 21, 2013
    Varna Airport in north-east Bulgaria provides an important international link for the country, with a runway rebuild helping improve capacity. The airport is of particular importance for Bulgaria’s tourist trade as it provides a major connection for visitors to the Black Sea coast. And the reconstruction work at Varna Airport’s only runway will ensure the facility is able to handle the area’s increasing visitor numbers. The project had to be carried out quickly and efficiently to prevent delays to f