Skip to main content

A Promax SP60 is hard at work for Yimtas Group in Turkey

Yimtas A.S. Group, based in Turkey, reports that it has produced 1,600 units of the preformed READYMARK thermoplastic road marking signs for the Turkish market since October. Yimtas was set up in 1980 to import products for use in the domestic production of road and guardrail safety barriers, traffic signs, thermoplastic road markings, component road markings as well as preformed thermoplastic READYMARK road signs. The company also has CE certificates approval.
May 9, 2016 Read time: 2 mins

8422 Yimtas A.S. Group, based in Turkey, reports that it has produced 1,600 units of the preformed READYMARK thermoplastic road marking signs for the Turkish market since October.

Yimtas was set up in 1980 to import products for use in the domestic production of road and guardrail safety barriers, traffic signs, thermoplastic road markings, component road markings as well as preformed thermoplastic READYMARK road signs. The company also has CE certificates approval.

The group’s manufacturing facility in the north-eastern Turkish city of Duzce, has 7,000m2 of closed manufacturing space and around 17,000m2 of open area.

Annual production capacity is 20,000tonnes of guardrail safety barriers, 3,500tonnes thermoplastic road markings, 3,500 units of preformed READYMARK thermoplastic road signs as well as 3,000tonnes of two-component road markings signs.

The company, working with the Danish manufacturer 2445 Promax Industries, has also produced 4,800tonnes of thermoplastic road marking paints since May 2015.

Also since May, Yimtas has been using the SP60 preformed thermoplastic sheets production plant from the Danish firm Promax. The SP60 can manufacture thermoplastic sheets for horizontal road signs, with production capacity of 140 sheets per hour.
Promax will install the plant within 10 working days in a customer’s area already fitted out with water pipes and lifting equipment. Training at customer’s facility is included, including the necessary thermoplastic formulations.

Quality control and thermoplastic development is done in close corporation with laboratory manager and on sight fully equipped thermoplastic laboratory.

Running the factory on full capacity requires four people: feeding material, controlling application, water cutting, and finally the collecting, packing and transportation of product to storage facilities.

For more information on companies in this article

Related Content

  • Liebherr achieves record turnover in 2012
    April 10, 2013
    The Liebherr Group achieved its highest turnover in its history in 2012. Turnover climbed over than 9% to €9.1 billion, while the company invested a total of €840 million in its operations. The 2012 business year progressed well for the Liebherr Group. Although the reduced dynamism of the world economy had a noticeable effect on orders received in the final months of the year, this no longer influenced turnover significantly. The Group increased its total turnover in the past business year by more than €760
  • Keestrack’s growing presence in China
    November 21, 2018
    Keestrack is introducing a comprehensive range of large tracked mobile machines to the Chinese market. These encompass all relevant screening and crushing technologies for quarrying, recycling and aggregates industry sectors. Four important new models are being unveiled. The B4 jaw crusher ensures less wear and better crushing capacities due to its double-deck vibrating pre-screen (2300 x 1000mm). The proven 1100 x 700mm jaw crusher (maximum feed size 600mm) reaches an hourly output up to 400tonnes and pro
  • Wirtgen KMA 220 passes with flying colours at Cologne/Bonn Airport
    July 25, 2018
    A Wirtgen KMA 220 produces hydraulically bound base using a mix-in-plant process for recycling at Cologne/Bonn Airport. With the mobile KMA 220 mobile cold recycling mixing plant from Wirtgen, road construction materials can be recycled or upgraded in just about any location. This avoids countless transport trips and is also sustainable and environmentally friendly. Finally, it is extremely economical, according to Wirtgen. This became clear from a job at Cologne/Bonn airport at the end of 2017. The plan
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T