Skip to main content

Prismo launches new road stud

Prismo Traffic Products has introduced a new moulded road stud that (in BSI British Standards road trials) is said to have exhibited a remarkable retained retro-reflectivity and 100% location retention over a one-year period. The technology behind the new product, branded Stimsonite Model 980, also designates the stud as "the highest performing reflecting road stud currently available to highway engineers."
February 23, 2012 Read time: 2 mins
The new road stud from Prismo is said to offer exceptionally good reflective performance over its working life
3091 Prismo Traffic Products has introduced a new moulded road stud that (in BSI British Standards road trials) is said to have exhibited a remarkable retained retro-reflectivity and 100% location retention over a one-year period.

The technology behind the new product, branded Stimsonite Model 980, also designates the stud as "the highest performing reflecting road stud currently available to highway engineers." In trials, Stimsonite Model 980 exhibited 409 mcd/lux of retained retro-reflectivity after one year, more than twice that required by BSEN1463 R1, which demands a minimum of 150 mcd/lux for such surface applied markers.

The new stud is provided as a system, incorporating a specifically designed polymer modified bitumen (PMB) adhesive for maximum retention and proven to perform above minimum requirements of BSEN1463 S1.

The Stimsonite stud adhesive is provided in three grades: tropical, semi-tropical and standard, to suit all climatic conditions for optimum retention. It is manufactured from extremely tough, injection-moulded, high impact resisting polymers and incorporates advanced air gap prismatic lens technology, protected by a highly abrasion resistant glass face.

"The stud's 17cm reflective area includes a 35° reflecting face that will continue functioning even if subject to damage," says Prismo. It is approved for use by the UK Highway Authorities.

For more information on companies in this article

Related Content

  • Singapore F1 racetrack uses Shell technology
    July 20, 2012
    The Singapore Grand Prix at the end of September was a race to remember for many reasons. Formula One's first night race saw excitement on the track, and it was a test for the high-performance surface containing Shell premium grade bitumen binder Cariphalte Racetrack. The inaugural Singapore Grand Prix was staged on a new street circuit and is open to regular motorists. Work on the track started in April 2008 and was completed in just two months. Because the road circuit is used for everyday traffic, the ne
  • Road surfacing: the case for sustainability
    March 5, 2020
    Erik Denneman* makes the social and business case for sustainable pavements for which much of the technology already exists.
  • Green solutions for safety road markings
    May 19, 2014
    Investigating the options for green roadmarkings solutions - *Dr Alexander Klein reports Global challenges such as climate change, urbanisation and aging societies are increasingly becoming more important in managing any industry today. Road markings must ensure traffic safety. But there are differences among them—in terms of functionality and performance and eco-friendliness. A certified life cycle assessment for major road marking materials and application technologies has found that cold plastic agglome
  • Global pressures driving bitumen developments
    June 19, 2015
    A raft of global pressures is driving developments in the materials and equipment we use for the handling, storage and treatment of bitumen. The goal is to achieve better performance and longer life for less financial outlay, and at the same time overcome the challenges of inconsistent and varying bitumen supplies. Kristina Smith reports.