Skip to main content

Plastic safety solution

HIGHLY VISIBLE plastic lane marker posts from Pexco have helped boost traffic flow and safety for the Olympic Winter Games.
February 6, 2012 Read time: 1 min
Some 7,000 FG 300 posts from Pexco were installed on Canada's Sea to Sky highway
HIGHLY VISIBLE plastic lane marker posts from 301 Pexco have helped boost traffic flow and safety for the Olympic Winter Games.

Many skiing events were held in Whistler, 115km inland from Vancouver and due to limited overnight accommodations in the resort town, many spectators commuted from Vancouver via the Sea to Sky Highway.

The highway, previously a twisting two lane road, has been upgraded with four lanes in both directions. At the same time, transportation planners wanted to create extra temporary northbound lanes during the morning rush and additional southbound lanes later in the day.

Around 7,000 of the Davidson FG300 posts from Pexco were installed along 11km of highway, enabling authorities to safely divert traffic into the temporary lanes. The FG300 posts are designed to cope with heavy traffic and rugged conditions. An alloy of polyurethane polymers gives the posts more strength than conventional traffic tubes. The cloverleaf design provides an effective rebound as the curving sides change the moment of inertia and build up potential energy. This results in a quick rebound when impacted.

The posts were extruded in fluorescent colours to improve visibility.

For more information on companies in this article

Related Content

  • Road Safety Foundation: low-cost road safety improvements pay off
    December 3, 2014
    A major speed limit review in the county resulted in the speed limit be reduced from around 65kph (40mph) to 48kph (30mph) on two short sections through the town of Amersham.
  • Busy UK interchange on M1 motorway close to completion
    August 28, 2018
    Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking
  • France to complete cycling network by 2030
    March 28, 2023
    Around 510km were created last year to the national network in an effort to get even hesitant cyclist onto their bicycles as a means of getting to work and also getting out to play, in the city or the countryside.
  • Compact machines deliver more - for less
    February 14, 2012
    The mini and midi excavator sector continues to squeeze more out of less, with some innovative engineering solutions being applied to zero- and short-tailswing models - Geoff Ashcroft investigates. It is a vicious circle - customers seek smaller, tighter, ever more compact excavators, leaving manufacturers with the challenges of squeezing greater levels of technology into what is all too often an even smaller machine.