Skip to main content

Plastic safety solution

HIGHLY VISIBLE plastic lane marker posts from Pexco have helped boost traffic flow and safety for the Olympic Winter Games.
February 6, 2012 Read time: 1 min
Some 7,000 FG 300 posts from Pexco were installed on Canada's Sea to Sky highway
HIGHLY VISIBLE plastic lane marker posts from 301 Pexco have helped boost traffic flow and safety for the Olympic Winter Games.

Many skiing events were held in Whistler, 115km inland from Vancouver and due to limited overnight accommodations in the resort town, many spectators commuted from Vancouver via the Sea to Sky Highway.

The highway, previously a twisting two lane road, has been upgraded with four lanes in both directions. At the same time, transportation planners wanted to create extra temporary northbound lanes during the morning rush and additional southbound lanes later in the day.

Around 7,000 of the Davidson FG300 posts from Pexco were installed along 11km of highway, enabling authorities to safely divert traffic into the temporary lanes. The FG300 posts are designed to cope with heavy traffic and rugged conditions. An alloy of polyurethane polymers gives the posts more strength than conventional traffic tubes. The cloverleaf design provides an effective rebound as the curving sides change the moment of inertia and build up potential energy. This results in a quick rebound when impacted.

The posts were extruded in fluorescent colours to improve visibility.

For more information on companies in this article

Related Content

  • Novel concrete surfacing option used in Colorado
    December 10, 2015
    Proven polyester bridge deck surfacing technology is now being used more widely – Mike Woof writes. The benefits of using polymer concrete bridge deck overlays are well known and this technology is becoming widely used in the US. The system can improve protection for bridge surfaces and help extend the life of a bridge deck, as well as increasing skid resistance. In the last 25 years the use of these overlays has increased significantly in the US. These perform best when installed on bridge decks that are i
  • Staffordshire road improvements planned
    July 29, 2024
    Staffordshire road improvements will commence shortly.
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.
  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes