Skip to main content

Pexco’s lays down a marker with its City Post Glue Down channaliser

Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down. City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the Florida Departmen
April 18, 2017 Read time: 2 mins
Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down


City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says 301 Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the 2697 Florida Department of Transportation.

The testing institute’s independent testing sought to establish new minimum standards for managed lane applications. Pexco said that this state-level DOT-sponsored event was the first head-to-head testing ever at an accredited third party test facility to determine the highest performing posts on the market.

Of the seven products tested from four different manufacturers, Pexco’s City Posts emerged as the top performers, with the new City Post GD testing 222% higher than the minimum impact standard recommended by researchers. All posts survived well over 100 impacts at 112kph. The one-piece construction posts need no drilling and thanks to their self-adhesive quality they can be glued down on both concrete and asphalt. One-piece construction means no assembly is required and there are also no springs to fail.

Pexco’s Davidson Traffic Product Division manufactures the City Post GD in the US. It also makes other systems, including kerb system lane separators, Type I, II and III barricades, reflectors for barrier walls, snow poles and many more, some of which are self-adhering.

Pexco is based near Atlanta in the state of Georgia. Last October it opened a facility called Extrusion and Engineering Center of Excellence at its Philadelphia facility.

The centre offers engineering consultation and design services for companies that require custom-extruded products or components. The facility focuses on the industrial market, including the lighting, filtration and traffic safety sectors.

For more information on companies in this article

Related Content

  • Dr Don Brock, chairman and former CEO of Astec, passes away after long illness
    March 12, 2015
    Dr Don Brock, chairman and former CEO of Astec Industries has passed away following a battle with cancer. He had been diagnosed with mesothelioma cancer in 2012. Dr Brock was one of the five founders of Astec Industries in 1972 and headed the firm during its steady growth into the international business it is today. The company now has 18 subsidiaries in the US and around the world as well as around 4,000 employees, while its annual turnover exceeds US$1 billion. The other four founders of the firm were Nor
  • New Siemens loop detector functionality
    November 11, 2013
    An improved version of the SLD4 loop detector family is now available from Siemens. The upgraded SLD4 is said to include sophisticated length-based classification with configurable outputs, which can be set to activate when specific conditions are detected, such as large vehicles exceeding a predefined speed. As well as offering standard vehicle detection, the latest version of the SLD4 ca
  • Bridge lift in Orlando for interstate rebuild
    July 4, 2019
    Measuring 33.8km long and costing US$2.3 billion, Orlando’s massive I-4 Ultimate is the largest infrastructure project in the Florida Department of Transportation’s history. Divided into four phases, the project requires major bridge work to improve traffic flow through Central Florida. In all, 13 existing structures are being widened, 53 new bridges added and 74 bridges replaced. Area 2, currently under construction, runs through Orlando from Highway 50 at the northern edge to the Highway 423/I-4 interc
  • Danish date for ViaTherm LongDot
    May 22, 2019
    Geveko Markings says that better visibility, reduction of noise and increased road safety are the benefits its new ViaTherm LongDot road marking. ViaTherm LongDot has been developed in collaboration with Vejdirektoratet - the Danish Road Directorate – and several of its partners within the highways sector, says Geveko. Road markings everywhere are based mainly on two types of markings. The ordinary flat road marking (Type I) and the structured profiled marking (Type II). Flat markings are noiseless