Skip to main content

Pexco’s lays down a marker with its City Post Glue Down channaliser

Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down. City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the Florida Departmen
April 18, 2017 Read time: 2 mins
Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down


City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says 301 Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the 2697 Florida Department of Transportation.

The testing institute’s independent testing sought to establish new minimum standards for managed lane applications. Pexco said that this state-level DOT-sponsored event was the first head-to-head testing ever at an accredited third party test facility to determine the highest performing posts on the market.

Of the seven products tested from four different manufacturers, Pexco’s City Posts emerged as the top performers, with the new City Post GD testing 222% higher than the minimum impact standard recommended by researchers. All posts survived well over 100 impacts at 112kph. The one-piece construction posts need no drilling and thanks to their self-adhesive quality they can be glued down on both concrete and asphalt. One-piece construction means no assembly is required and there are also no springs to fail.

Pexco’s Davidson Traffic Product Division manufactures the City Post GD in the US. It also makes other systems, including kerb system lane separators, Type I, II and III barricades, reflectors for barrier walls, snow poles and many more, some of which are self-adhering.

Pexco is based near Atlanta in the state of Georgia. Last October it opened a facility called Extrusion and Engineering Center of Excellence at its Philadelphia facility.

The centre offers engineering consultation and design services for companies that require custom-extruded products or components. The facility focuses on the industrial market, including the lighting, filtration and traffic safety sectors.

For more information on companies in this article

Related Content

  • Chinese automaker opens first European plant
    April 24, 2012
    Great Wall Motor has become the first Chinese carmaker to open an assembly plant in Europe as it aims to lift sales in the region and, according to a company statement, is also a symbolic event for Chinese auto brands to challenge the high-end market car in the EU. The assembly plant, inaugurated this week in Bulgaria, has a production capacity of 50,000 cars and the Voleex C10 will be the first assembled model, followed by the Wingle 5, Voleex C20R, and Haval.
  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Dual speed control for the V-Maxx G2 hopper spreader from SnowEx
    November 7, 2017
    SnowEx’s latest hopper spreader, the V-Maxx G2, for ice control applications includes a dual variable-speed control more compact than on previous models. The manufacturers says that the digital, self-diagnosing control unit allows independent adjustment of spinner and auger speeds, while convenient buttons offer easy control of the standard vibrator and optional accessories. It includes an auto reverse function to easily clear auger jams. The control requires only a single four-pin wire to enter the cab,