Skip to main content

Pexco’s lays down a marker with its City Post Glue Down channaliser

Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down. City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the Florida Departmen
April 18, 2017 Read time: 2 mins
Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down


City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says 301 Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the 2697 Florida Department of Transportation.

The testing institute’s independent testing sought to establish new minimum standards for managed lane applications. Pexco said that this state-level DOT-sponsored event was the first head-to-head testing ever at an accredited third party test facility to determine the highest performing posts on the market.

Of the seven products tested from four different manufacturers, Pexco’s City Posts emerged as the top performers, with the new City Post GD testing 222% higher than the minimum impact standard recommended by researchers. All posts survived well over 100 impacts at 112kph. The one-piece construction posts need no drilling and thanks to their self-adhesive quality they can be glued down on both concrete and asphalt. One-piece construction means no assembly is required and there are also no springs to fail.

Pexco’s Davidson Traffic Product Division manufactures the City Post GD in the US. It also makes other systems, including kerb system lane separators, Type I, II and III barricades, reflectors for barrier walls, snow poles and many more, some of which are self-adhering.

Pexco is based near Atlanta in the state of Georgia. Last October it opened a facility called Extrusion and Engineering Center of Excellence at its Philadelphia facility.

The centre offers engineering consultation and design services for companies that require custom-extruded products or components. The facility focuses on the industrial market, including the lighting, filtration and traffic safety sectors.

For more information on companies in this article

Related Content

  • Volvo CE is investing in its research and development
    May 20, 2014
    Volvo Construction Equipment has started work on its new test and development centre in Hapcheon, Korea. The facility lies close to the company’s existing excavator manufacturing facility in Changwon. The new facility doubles as Volvo CE’s excavator testing capacity in Korea and includes an all-weather test dome, reliability and noise test field, workshops, various complete machine performance test areas and a customer clinic. Engineers at the 253,515m2 site will focus on excavator product development, adva
  • First phase of Houston reversible HOV to HOT lanes completed
    April 19, 2012
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135k
  • India plans major infrastucture investment
    February 10, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports. On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt.
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent