HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of Balfour Beatty Civil Engineering along with equal joint venture partners Morga
February 15, 2012 Read time: 2 mins
Noise attenuation panels from Holgate are being installed on the M74 project close to Glasgow in the UK
HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of 1146 Balfour Beatty Civil Engineering along with equal joint venture partners Morgan EST, Morrison Construction and Sir Robert McAlpine, are responsible for the contract worth €512 million (£445 million) to design and construct an 8km extension to the M74. This extension will reduce congestion on the busiest stretch of the M8 through Glasgow.

Holgate is providing 12,000m2 of products to reduce noise along this built up route. The product selected was the Holgate High performance Aluminium absorbent system.

Holgate completed a full re-design of the project and the contract also includes the side fixing of reinforced transparent acrylic barriers from to the outside of seven bridge structures.

The contract is the largest single noise barrier project in the UK at present and sets a new standard in noise barrier specification in the UK which is consistent with best practice throughout Europe. Also in Scotland Holgate has recently been awarded the crash barrier contract for the A9 Crubenmore which requires 7.5km of Vetex barrier systems together with P4 terminals.

For more information on companies in this article

Related Content

  • Durisol barrier passes MASH TL-4 crash test
    February 23, 2021
    The aluminium noise wall barrier is prefabricated and has tongue and groove assembly.
  • Scottish Roads Partnership to complete Central Scotland motorway network
    August 30, 2013
    Scottish Roads Partnership (SRP) has been announced as preferred bidder for the design, construction, financing and operation of a major infrastructure project to complete the Central Scotland motorway network. The key project will complete the motorway network between Glasgow and Edinburgh by upgrading the A8 trunk road between Baillieston and Newhouse to full motorway standards. It also includes work to improve the Raith Interchange and widening key sections of the M8, M73 and M74. This involves constr
  • Scottish road contract moves ahead
    August 30, 2021
    Progress is being seen for a key Scottish road contract.
  • Scottish Roads Partnership preferred bidder for M8, M73 and M74 upgrades
    August 23, 2013
    The Scottish Roads Partnership has been given preferred bidder status by Transport Scotland for the upgrade of the M8, M73 and M74 motorways. Work on the €484.35 million (£415 million) M8, M73 and M74 Motorway Improvements programme, which includes widening sections of each of the motorways, is scheduled to be completed by spring 2017. The Scottish Roads Partnership consortium consists of Ferrovial Agroman (Amey) and Lagan.