Noise and crash barriers, high strength protection

HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension.
April 4, 2012 Read time: 2 mins
Noise attenuation panels from Holgate are being installed on the M74 project close to Glasgow in the UK
RSSHOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and 2958 Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of 1146 Balfour Beatty Civil Engineering along with equal joint venture partners Morgan EST, Morrison Construction and 3081 Sir Robert McAlpine, are responsible for the contract worth €512 million (£445 million) to design and construct an 8km extension to the M74. This extension will reduce congestion on the busiest stretch of the M8 through Glasgow.

Holgate is providing 12,000m2 of products to reduce noise along this built up route. The product selected was the Holgate High performance Aluminium absorbent system.

Holgate completed a full re-design of the project and the contract also includes the side fixing of reinforced transparent acrylic barriers from to the outside of seven bridge structures.

The contract is the largest single noise barrier project in the UK at present and sets a new standard in noise barrier specification in the UK which is consistent with best practice throughout Europe. Also in Scotland Holgate has recently been awarded the crash barrier contract for the A9 Crubenmore which requires 7.5km of Vetex Barrier Systems together with P4 terminals.

For more information on companies in this article

Related Content

  • Stirling Lloyd launches Bond Coat 3, part of the Eliminator series
    July 7, 2016
    Stirling Lloyd Polychem has introduced a cold, spray-applied bond coat that it says provides enhanced adhesion values and superior in-situ performance Bond Coat 3, part of the Eliminator bridge deck waterproofing system, “represents a significant development” in the provision of tack and bond coats that are used to adhere the asphalt surfacing to the waterproofing. It provides a fast-curing tack-free, durable protective finish that resists contamination and damage from traffic. It removes the risk of
  • Sandvik wins tunneling machine deal in Australia
    July 6, 2015
    Sandvik is supplying a major order of tunnelling machinery for use on a construction project in Australia. This deal is for a major tunnelling project in Sydney. The NSW Government, Transurban and the M7 Westlink Shareholders (the Project Sponsors) are in process to build, operate and maintain a tolled motorway linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. The new route will be called NorthConnex.
  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • The MBT-1 from Mobile Barriers now protecting workers in the UK
    July 16, 2019
    Two giant US-made 21m-long mobile barriers are now keeping highway maintenance workers safe in England. The 16tonne barriers were made in by Mobile Barriers, based in Denver, in the state of Colorado. They have been deployed in the West Midlands region of England in collaboration with UK highways maintenance contractor Kier. With yearly operating costs of US$17,000, the MBT-1 can pay for itself with nominal usage, according to the manufacturer. This could be in less than two years with 10-15 lane clos