Skip to main content

Noise and crash barriers, high strength protection

HOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension.
April 4, 2012 Read time: 2 mins
Noise attenuation panels from Holgate are being installed on the M74 project close to Glasgow in the UK
RSSHOLGATE INFRASTRUCTURE & Motorway Services has supplied vehicle restraint systems and noise attenuation panels to major highway upgrade projects in the UK. The firm has installed Vetex crash barriers and high performance aluminium noise barriers on the M50 Linton upgrade for Alu Griffiths and 2958 Amey. Holgate has also supplied the noise barrier package on the M74 Glasgow motorway extension. Interlink M74 Joint Venture, comprising of 1146 Balfour Beatty Civil Engineering along with equal joint venture partners Morgan EST, Morrison Construction and 3081 Sir Robert McAlpine, are responsible for the contract worth €512 million (£445 million) to design and construct an 8km extension to the M74. This extension will reduce congestion on the busiest stretch of the M8 through Glasgow.

Holgate is providing 12,000m2 of products to reduce noise along this built up route. The product selected was the Holgate High performance Aluminium absorbent system.

Holgate completed a full re-design of the project and the contract also includes the side fixing of reinforced transparent acrylic barriers from to the outside of seven bridge structures.

The contract is the largest single noise barrier project in the UK at present and sets a new standard in noise barrier specification in the UK which is consistent with best practice throughout Europe. Also in Scotland Holgate has recently been awarded the crash barrier contract for the A9 Crubenmore which requires 7.5km of Vetex Barrier Systems together with P4 terminals.

For more information on companies in this article

Related Content

  • Amey secures ITS deal with Transport Scotland
    January 3, 2022
    Amey will operate and maintain variable messaging signs, CCTV, emergency roadside telephones and various power and communication cabinets.
  • Balfour Beatty begins construction of €23.05mn Merseyside motorway link
    January 31, 2014
    Balfour Beatty this week began construction on a €23.05 million (£19 million) scheme to bypass two congested villages and link communities in Sefton along the west coast of Merseyside in Northwest England directly to the M57 and M58 motorways. The road will be 4.5km long and connect the A565 Southport Road to the motorway junction at Switch Island, avoiding the villages of Thornton and Netherton. The newly designated A5758 Broom’s Cross Road will relieve long-standing traffic issues in the area and provid
  • Energy absorbing safety barrier
    March 9, 2012
    Barrier Systems says that its new tensioned barrier offers high energy absorbing capabilities in head-on collisions. The company says that this is because the X-Tension technology is a tension-based solution rather than compression-based. The new range delivers good performance in these applications, as energy is absorbed with resistance at the impact head rather than being transferred down the rail as occurs with other systems. Even high-angle (15° during testing) impacts on the nose resulted in the vehicl
  • UK Roads Crash Demo Day is a Big Hit
    July 19, 2012
    Representatives from local authorities, the police, and the highway safety-related business world attended last month’s UK Roads Crash Demonstration Day at MIRA near Nuneaton, in central England. Guy Woodford reports It was never meant to be an occasion for crash test dummies. And each of the latest road safety solutions from leading highway technology companies tested at the UK Roads Crash Demonstration Day passed with top marks. A crowd of over 100 enjoyed the high impact, minimum damage action.