Skip to main content

Morelock's 3M sign sheets

Using the latest technology from 3M has helped UK sign-maker Morelock to achieve the new European harmonised standard BS EN 12899:2007 for fixed vertical road traffic signs. The signs also feature the CE mark and use the latest 3M reflective sheeting.
February 7, 2012 Read time: 1 min
Ultra-high visibility is claimed for the new signs thanks to 3M sheeting
Using the latest technology from 152 3M has helped UK sign-maker 2372 Morelock to achieve the new European harmonised standard BS EN 12899:2007 for fixed vertical road traffic signs. The signs also feature the CE mark and use the latest 3M reflective sheeting.

This new standard is very thorough and includes an assessed factory production control (FPC), in-line test, calculation of post and foundation details to comply with wind loading and independent product testing.

Meanwhile Morelock's own branded substrate material, MPGRP, was also submitted to for product initial type testing, and passed.

For more information on companies in this article

Related Content

  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Traffic management drives sustainability
    June 18, 2012
    New initiatives could boost transport sustainability – David Crawford writes. New roles are opening up for urban traffic management systems in helping city authorities to meet increasingly stringent governmental and supra-governmental air quality standards. European local authorities are typically tasked with both traffic management and pollution monitoring within their areas, making them well placed to draw on the latter to mitigate the impacts of the former.
  • Cost effective road maintenance
    February 7, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports
  • Doosan launches 5tonne DX57W-5 stage 3B compliant wheeled excavator
    February 10, 2016
    Doosan Construction Equipment’s new 5 tonne DX57W-5 Stage IV compliant wheeled excavator complies with the latest Stage 3B emission regulations. The DX57W-5 has increased power from the 42.5kW Doosan D24 4-cylinder engine which meets Stage 3B emission regulations without the need for a diesel particulate filter (DPF), through the use of cooled exhaust gas recirculation (EGR) and diesel oxidation catalyst (DOC) after-treatment technologies. Factory tests show a 15% increase in fuel efficiency, depending