Skip to main content

Minnich’s concrete barrier wall drill slides along the barriers

Minnich Manufacturing, a maker of concrete dowel pin drills, concrete paving vibrators and vibrator monitoring systems, has developed a concrete barrier wall drill. The tool drills vertical holes for the pins used to secure temporary concrete traffic barriers. Minnich, based in Mansfield, Ohio, said the air-driven and self-propelled drill straddles and rides along the top of the temporary wall. A tethered controller enables the operator to simultaneously drill three accurate, consistent pin holes — through
April 18, 2017 Read time: 2 mins
Minnich Manufacturing, a maker of concrete dowel pin drills, concrete paving vibrators and vibrator monitoring systems, has developed a concrete barrier wall drill.


The tool drills vertical holes for the pins used to secure temporary concrete traffic barriers. 286 Minnich, based in Mansfield, Ohio, said the air-driven and self-propelled drill straddles and rides along the top of the temporary wall. A tethered controller enables the operator to simultaneously drill three accurate, consistent pin holes — through pre-molded holes in the wall, through the road, into the sub-base — while positioned on the non-traffic side of the barrier.

The introduction of Minnich’s concrete barrier wall drill comes just as US states move towards requiring temporary barriers to be pinned, according to Todd Jurjevic, director of sales at Minnich Manufacturing. “The new drill saves contractors significant time and cost and promotes safety by eliminating the need to hand-drill pin holes on the traffic side of the barrier.”

Additionally, the tethered controller removes the operator from excess debris and dust. Minnich claims that on one Illinois highway construction project, the contractor realised  35% time savings, nearly 20% labour and equipment cost savings and around 30% bit cost savings compared to a three-person crew using high-powered rotary hand drills. The contractor also reported that the accuracy and consistency of the holes drilled by the Minnich drill made pin removal significantly easier. Hand drilling can result in inconsistent holes with varying angles, making pin removal a challenge.

Minnich can customise the drill to fit F-shape barriers, Jersey barriers or any other barrier wall profile. Drill spacing and hole-depth of the drill are fully adjustable. The unit can be easily moved with a forklift and loaded onto the wall with a backhoe or service crane.

For more information on companies in this article

Related Content

  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Concrete removal using high pressure water jets
    April 11, 2012
    The use of high-pressure water jets to remove old concrete on structures is becoming increasingly popular Hydrodemolition of concrete structures by robotic equipment is becoming an increasingly used method for removing deteriorated concrete with high-pressure water techniques. It offers the selective removal of deteriorated concrete, while retaining sound concrete below the intended level of removal, a process that will not damage rebar or cause micro-cracks in the concrete, as will mechanical methods s
  • Concrete removal using high pressure water jets
    May 8, 2012
    The use of high-pressure water jets to remove old concrete on structures is becoming increasingly popular. Hydrodemolition of concrete structures by robotic equipment is becoming an increasingly used method for removing deteriorated concrete with high-pressure water techniques.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci