Skip to main content

Minnich’s concrete barrier wall drill slides along the barriers

Minnich Manufacturing, a maker of concrete dowel pin drills, concrete paving vibrators and vibrator monitoring systems, has developed a concrete barrier wall drill. The tool drills vertical holes for the pins used to secure temporary concrete traffic barriers. Minnich, based in Mansfield, Ohio, said the air-driven and self-propelled drill straddles and rides along the top of the temporary wall. A tethered controller enables the operator to simultaneously drill three accurate, consistent pin holes — through
April 18, 2017 Read time: 2 mins
Minnich Manufacturing, a maker of concrete dowel pin drills, concrete paving vibrators and vibrator monitoring systems, has developed a concrete barrier wall drill.


The tool drills vertical holes for the pins used to secure temporary concrete traffic barriers. 286 Minnich, based in Mansfield, Ohio, said the air-driven and self-propelled drill straddles and rides along the top of the temporary wall. A tethered controller enables the operator to simultaneously drill three accurate, consistent pin holes — through pre-molded holes in the wall, through the road, into the sub-base — while positioned on the non-traffic side of the barrier.

The introduction of Minnich’s concrete barrier wall drill comes just as US states move towards requiring temporary barriers to be pinned, according to Todd Jurjevic, director of sales at Minnich Manufacturing. “The new drill saves contractors significant time and cost and promotes safety by eliminating the need to hand-drill pin holes on the traffic side of the barrier.”

Additionally, the tethered controller removes the operator from excess debris and dust. Minnich claims that on one Illinois highway construction project, the contractor realised  35% time savings, nearly 20% labour and equipment cost savings and around 30% bit cost savings compared to a three-person crew using high-powered rotary hand drills. The contractor also reported that the accuracy and consistency of the holes drilled by the Minnich drill made pin removal significantly easier. Hand drilling can result in inconsistent holes with varying angles, making pin removal a challenge.

Minnich can customise the drill to fit F-shape barriers, Jersey barriers or any other barrier wall profile. Drill spacing and hole-depth of the drill are fully adjustable. The unit can be easily moved with a forklift and loaded onto the wall with a backhoe or service crane.

For more information on companies in this article

Related Content

  • Upgrades by Power Pavers ensure old generation slipformer uses new Topcon machine control system
    July 1, 2013
    Upgrades to a slipform concrete paver built in 1999 allow it to use current technology. US firm Streb Construction has taken a novel approach to its paving fleet by upgrading a CMI paver built in 1999 to use modern machine control technology. The company bought the CMI SF3302 machine new and this piece of equipment had logged a high number of hours since its purchase. However the company realised that this proven piece of equipment could be made to operate more efficiently and productively, as well as more
  • Concrete competition
    February 13, 2012
    The concrete paving market has provided stable ground for existing players, though key market developments are in hand. US manufacturers have long dominated the concrete paving sector with well-known firms such as GOMACO, Guntert & Zimmerman, Power Curbers, Power Pavers and Terex all being based in the US, while German firm Wirtgen is Europe's leading contender in this market. However there is some jostling for position in the concrete paving sector, with some of the players looking to enter new segments. T
  • Choosing the right dowel drilling equipment
    April 11, 2012
    Several aspects factor into choosing the proper concrete dowel drill - Randy Stevens. The concrete paving industry has seen significant changes to dowel drilling equipment over the years. Many years ago only hand-held models existed and when the first hydraulic drills were launched over 30 years ago, these increased production and reduced labour needs. Since that time pneumatic drills, have come to market and these are driven by air compressors, which are common on many worksites while the units also have l
  • Advances in concrete paving materials
    July 9, 2012
    Innovations in materials technology, as well as machines, could provide a major boost to the concrete paving sector - Mike Woof reports Development of new material technologies for the concrete paving sector continues apace and the latest innovations could provide the biggest boost for this market in many years. High performance cementitious material (HPCM) is an innovative concept that has been developed and tested for road surfacing applications as part of a project in which the UK's Transport Research La