Skip to main content

Matador4 Heald in high regard

Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48mph during a recent crash test. The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres. Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.
June 21, 2012 Read time: 1 min
5976 Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48kph during a recent crash test.

The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres.

Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.

A company spokesperson said: “One of the benefits of this new system is the bollard does not lower into the ground so is therefore visible to users at all times making transit extremely safe for the driver and also any passing pedestrians.”

For more information on companies in this article

Related Content

  • Highways England to trial different speeds through road works
    August 6, 2018
    Highways England is trialling different speed limits through roadworks during different times in order to respond to drivers’ feedback. Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads, said it is acting on drivers’ frustration with roadworks. Speed through motorway roadworks could be increased depending on what day of the week they are travelling. The decision follows earlier trials to increase the speed l
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • New software makes road marking applications easier
    February 17, 2012
    Equipment, materials and testing combine to offer motorists better road markings as Patrick Smith reports Drivers realise that clear road markings, particularly in darkness and during the wet, are life-savers, offering guidance and direction. Manufacturers of marking materials, in-road studs, and testing and laying equipment have spent years perfecting solutions to make such markings easier to place; easier to see through the use of a variety of materials, and longer lasting. Sophisticated testing equip