Skip to main content

Matador4 Heald in high regard

Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48mph during a recent crash test. The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres. Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.
June 21, 2012 Read time: 1 min
5976 Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48kph during a recent crash test.

The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres.

Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.

A company spokesperson said: “One of the benefits of this new system is the bollard does not lower into the ground so is therefore visible to users at all times making transit extremely safe for the driver and also any passing pedestrians.”

For more information on companies in this article

Related Content

  • Wirtgen paving technology takes off at Frankfurt
    February 27, 2017
    Time was at a premium for Wirtgen machinery when resurfacing the runway at Frankfurt/Main Airport Europe’s third largest airport, Frankfurt/Main, has new surface course on runways about every seven year, including the centre runway, the most-frequently used section.
  • Road deaths: 'something must change' - GHSA
    March 4, 2024
    The ‘grim and tragic milestone' of a total four million deaths in the US requires renewed road safety action, says the Governors Highway Safety Association (GHSA).
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Concrete production innovation – mobility the key
    July 5, 2016
    Versatility and productivity are key drivers for the concrete plant sector - Mike Woof writes. The days of most construction machines being expressly designed and built for a single specific purpose have gone. These days construction equipment is largely intended to be versatile and adaptable, allowing it to be operated in a wide array of applications and duties. New concrete plants are designed too for mobility as this allows users to set up highly productive equipment quickly on basic sites, with little p