Skip to main content

Matador4 Heald in high regard

Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48mph during a recent crash test. The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres. Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.
June 21, 2012 Read time: 1 min
5976 Heald says its Matador4 bollard was fully functional with zero penetration and dispersion after being struck by a 7,500kg truck travelling at 48kph during a recent crash test.

The model, comprising two central moving bollards and based on the Matador3, gives a clear opening of just over 4metres.

Surface mounted and only needing to be bolted into place, the Matador4 is said by Heald to be ideal for a variety of applications including temporary installations.

A company spokesperson said: “One of the benefits of this new system is the bollard does not lower into the ground so is therefore visible to users at all times making transit extremely safe for the driver and also any passing pedestrians.”

For more information on companies in this article

Related Content

  • ERIC 2016: What shape the ‘Smart Road’?
    February 7, 2017
    Optimism about the future of highways worldwide abounded at the inaugural European Road Infrastructure Conference (ERIC) in Leeds, UK. Around 500 delegates passed through the varied sessions during the three-day event at the Royal Armouries Museum in the northern English city of Leeds. They came away with many visions of what a motorway and road could look like. But what speakers at the event - co-organised by the Brussels-based European Union Road Federation (ERF) and the UK’s Road Safety Markings Associat
  • Vital structures
    February 10, 2012
    A wide variety of products are available to help bridge owners reduce the need for costly repairs. Bridges are one of the most expensive structures on a highway system, and their maintenance, and where necessary, repair will save millions over time. Prevention being better than cure means that anything that can be done to reduce the need for repair is a good investment. For example, a MOOG bucket-type inspection unit has been commissioned for the Naini Bridge in Allahabad in the state of Uttar Pradesh, Indi
  • New approach needed in Europe to help improve motorcycle safety
    August 22, 2012
    The European Commission is proposing that part of its controversial new Anti-Tampering regulations for motorcycles should be re-written to prevent custom motorcycle builders from using long-forks. This is the latest in a series of requirements in the regulations to attracted criticisms from motorcycle manufacturers, dealers, safety campaigners and enthusiasts groups.
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.