Skip to main content

London’s Westminster Council goes for gully offenders

Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.
February 8, 2018 Read time: 2 mins
Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders


The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM 2329 Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.

But other items cause major blockages that can lead to serious flooding even after manageable rain levels. Since July, FM Conway has surveyed around 200 gullies with CCTV. Objects found include gold jewellery, knives, vehicle number plates and dozens of mobile phones. Notably, the council said that that gullies around building sites are often blocked with commercial waste – such as sand and concrete. Last year street cleansing teams were called to a gully that was bubbling with an unidentified florescent green liquid and a gully near Oxford Street was found blocked by five full sand bags.

Sometimes, as a last resort, cars must be lifted off the street to gain access to a drain – a costly and time-consuming process.

To counter all this, Westminster City Council is looking to ensure licensed building sites are covering all the costs of cleansing road gullies next to their premises. A sewerage surcharge could be the answer. It would be incorporated into structural licence fees paid by contractors and be based on the number of gullies likely to be affected by the company’s works. It would cover a charge for the council’s contractor and staffing costs associated with cleaning the affected gullies.

FM Conways’ work with CCTV footage is also helping discover pipes and gullies unknown to the council and from which the Greater London Authority is creating a comprehensive inventory. Cleansing teams do not know the condition of the pipe until they send in a push-rod camera. The footage reveals if repairs are needed. If a pipe is damaged the team pump in a liner, followed by a resin, which solidifies and creates a new lining which will last for up to 25 years. However, if a pipe has fully collapsed, no amount of lining will fix it and the pipe will require digging work.

For more information on companies in this article

Related Content

  • Innovative burner cooling for asphalt plant
    March 15, 2016
    Günter Papenburg has developed a cooling feature for asphalt plants that it says shortens the time normally needed for a plant’s coal dust-fuelled burners to reach operating temperatures. The cooling technology has been licenced from LOESCHE, a German producer of coal milling systems. GP managing director Carsten Weiss claimed that the firm’s burners consume more of the fuel than rival types, which only burn 90% of the coal dust. “We get an asphalt temperature of 170°C with low emissions and high efficiency
  • Learning record
    June 4, 2019
    Learning record A young driver in Germany managed to be banned from driving a mere 49 minutes after passing his test. Perhaps in jubilation at having passed the test, and no longer having to rely on his friends or ‘dad’s taxi' for transport, the 18 year-old driver inadvisedly pressed pedal to metal. Officers in the town of Hemer, near Dortmund, used a laser unit to determine the vehicle’s speed, seeing that it was travelling at 95km/h in a 50km/h zone. Perhaps he was trying to show his driving skills to hi
  • JCB donates US$500,000 of machines and generators to the typhoon-hit Philippines
    November 13, 2013
    British construction equipment manufacturing giant JCB is to provide machines and generators worth more than US$500,000 to assist vital clean-up work in the typhoon-hit Philippines. The company is sending a fleet of three 3CX backhoe loaders after Typhoon Haiyan, one of the most powerful storms ever recorded on land, left up to 2,500 people dead. In addition, more than 120 JCB electrical generators are being provided through the company’s Filipino dealer Camec. The generators are already being used to po
  • Swell times for swale construction with a Sidewinder
    October 9, 2018
    Specialised swale construction featured in Northern England recently UK contractor Balfour Beatty examined different methods for building swales along the Norwich Northern Distributor Road near the English city of Norwich. Balfour decided to trial specialised road-widening machines, specially configured excavator buckets and modified compaction equipment. Excavators and dump trucks prepared the area for placement of sub-base material. The swale areas were constructed using both conventional methods as wel