Skip to main content

Lindsay Transport’s Road Zipper at Hirschstetten and Stadlau Tunnels

Lindsay Transportation Solutions recently used the Intertraffic exhibition in Amsterdam to highlight a major deployment of its Road Zipper System in Austria Work is underway in Vienna to rehabilitate two ageing tunnels and the asphalt highway sections that connect them – a major route into and out of the Austrian capital Vienna. Tunnels, like bridges, offer additional challenges for road works. Typically, there is very little additional space and a work zone must be created from active traffic lanes. The
July 5, 2016 Read time: 3 mins
Changing lanes with Road Zipper
2438 Lindsay Transportation Solutions recently used the Intertraffic exhibition in Amsterdam to highlight a major deployment of its Road Zipper System in Austria

Work is underway in Vienna to rehabilitate two ageing tunnels and the asphalt highway sections that connect them – a major route into and out of the Austrian capital Vienna. Tunnels, like bridges, offer additional challenges for road works. Typically, there is very little additional space and a work zone must be created from active traffic lanes. The Vienna work zone runs for 3km in the southbound direction of the A23, and it includes structural repairs to the Hirschstetten Tunnel and the Stadlau Tunnel.

The Hirschstetten Tunnel at the north end of the work zone is two lanes per tunnel direction. The Stadlau Tunnel to the south provides three lanes in each direction.

“The A23 would suffer massive traffic queues if all lanes were not available for the peak traffic commute,” explained Paul Grant of Lindsay Transportation Solutions. The Road Zipper System includes the QuickChange Moveable Barrier – QMB - and the Road Zipper transfer machine. These are T-shaped concrete barriers that connect to form a continuous wall. A transfer machine (vehicle) is used to move the concrete barriers laterally across the pavement, creating a moveable “zipper lane.”

“To create a work zone where lanes could be quickly opened and closed while still providing positive barrier separation between workers and motorists, ASFiNAG, the Austrian publicly-owned corporation which plans, finances, builds, maintains and collects tolls for the Austrian autobahns, chose our Road Zipper System. The barrier wall sections were brought from the Netherlands and installed over a three-night period by Marjo Salari Transport. The Barrier Transfer Machine, or BTM, was imported by Alpina and is operated on a nightly basis by subcontractor Sitec.”

Each night, the barrier wall is moved out and the work zone is expanded to make room for larger, more efficient equipment than would be possible without the extra work zone space.  Construction crews work efficiently knowing that they are protected from vehicle encroachments into the work zone by the concrete barrier.

The Austria tunnels project is the most recent European road works to use the Road Zipper System, which has been used successfully for road works in Italy, the Netherlands and the UK. In 2006, Lindsay Corporation acquired Barrier Systems, a company founded in 1984.

For more information on companies in this article

Related Content

  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Advances in tunneling technology offer efficiency
    October 18, 2017
    New developments in tunnelling technologies offer contractors greater efficiencies when constructing new bores. Tunnel boring machines (TBMs) are widely being used in major projects such as the Brenner Base Tunnel in the Austrian Alps. Full face TBMs are highly sophisticated machines featuring a rotating drilling head, which removes the material, and, depending on the type of construction, secures the excavated tunnel with shotcrete, rock bolts and wire mesh or prefabricated segments of reinforced concrete.
  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Crash barriers aid vehicle protection, road safety
    February 8, 2012
    Barrier and crash cushion systems can make a great deal of difference to roadway safety, with new technology offering major benefits to road users. In North America and Western Europe, concrete centre line dividers are being used for many major highways as these provide a durable solution for preventing cross-over accidents with large vehicles such as heavy trucks. It is worth noting too that other countries are now adopting concrete barriers for highway centre line dividers also, with this system being use