Skip to main content

Lindsay Transport’s Road Zipper at Hirschstetten and Stadlau Tunnels

Lindsay Transportation Solutions recently used the Intertraffic exhibition in Amsterdam to highlight a major deployment of its Road Zipper System in Austria Work is underway in Vienna to rehabilitate two ageing tunnels and the asphalt highway sections that connect them – a major route into and out of the Austrian capital Vienna. Tunnels, like bridges, offer additional challenges for road works. Typically, there is very little additional space and a work zone must be created from active traffic lanes. The
July 5, 2016 Read time: 3 mins
Changing lanes with Road Zipper
2438 Lindsay Transportation Solutions recently used the Intertraffic exhibition in Amsterdam to highlight a major deployment of its Road Zipper System in Austria

Work is underway in Vienna to rehabilitate two ageing tunnels and the asphalt highway sections that connect them – a major route into and out of the Austrian capital Vienna. Tunnels, like bridges, offer additional challenges for road works. Typically, there is very little additional space and a work zone must be created from active traffic lanes. The Vienna work zone runs for 3km in the southbound direction of the A23, and it includes structural repairs to the Hirschstetten Tunnel and the Stadlau Tunnel.

The Hirschstetten Tunnel at the north end of the work zone is two lanes per tunnel direction. The Stadlau Tunnel to the south provides three lanes in each direction.

“The A23 would suffer massive traffic queues if all lanes were not available for the peak traffic commute,” explained Paul Grant of Lindsay Transportation Solutions. The Road Zipper System includes the QuickChange Moveable Barrier – QMB - and the Road Zipper transfer machine. These are T-shaped concrete barriers that connect to form a continuous wall. A transfer machine (vehicle) is used to move the concrete barriers laterally across the pavement, creating a moveable “zipper lane.”

“To create a work zone where lanes could be quickly opened and closed while still providing positive barrier separation between workers and motorists, ASFiNAG, the Austrian publicly-owned corporation which plans, finances, builds, maintains and collects tolls for the Austrian autobahns, chose our Road Zipper System. The barrier wall sections were brought from the Netherlands and installed over a three-night period by Marjo Salari Transport. The Barrier Transfer Machine, or BTM, was imported by Alpina and is operated on a nightly basis by subcontractor Sitec.”

Each night, the barrier wall is moved out and the work zone is expanded to make room for larger, more efficient equipment than would be possible without the extra work zone space.  Construction crews work efficiently knowing that they are protected from vehicle encroachments into the work zone by the concrete barrier.

The Austria tunnels project is the most recent European road works to use the Road Zipper System, which has been used successfully for road works in Italy, the Netherlands and the UK. In 2006, Lindsay Corporation acquired Barrier Systems, a company founded in 1984.

For more information on companies in this article

Related Content

  • Regensburg road revamp will widen key stretch
    February 16, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the
  • Cat paves the way in Portugal
    June 22, 2012
    Caterpillar pavers were used recently to help improve drainage on a vital road into a popular tourist destination in Portugal. The Avenida Marginal is the main road access into Cascais, a village with historic hotels, winding roads and stunning views of the Atlantic Ocean attracting thousands of holidaymakers each year. However, the highway had been suffering from poor draining resulting in rivulets being formed in heavy rain, making travelling hazardous for cars and pedestrians alike.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t