Skip to main content

Lindsay Transport’s Road Zipper at Hirschstetten and Stadlau Tunnels

Lindsay Transportation Solutions recently used the Intertraffic exhibition in Amsterdam to highlight a major deployment of its Road Zipper System in Austria Work is underway in Vienna to rehabilitate two ageing tunnels and the asphalt highway sections that connect them – a major route into and out of the Austrian capital Vienna. Tunnels, like bridges, offer additional challenges for road works. Typically, there is very little additional space and a work zone must be created from active traffic lanes. The
July 5, 2016 Read time: 3 mins
Changing lanes with Road Zipper
2438 Lindsay Transportation Solutions recently used the Intertraffic exhibition in Amsterdam to highlight a major deployment of its Road Zipper System in Austria

Work is underway in Vienna to rehabilitate two ageing tunnels and the asphalt highway sections that connect them – a major route into and out of the Austrian capital Vienna. Tunnels, like bridges, offer additional challenges for road works. Typically, there is very little additional space and a work zone must be created from active traffic lanes. The Vienna work zone runs for 3km in the southbound direction of the A23, and it includes structural repairs to the Hirschstetten Tunnel and the Stadlau Tunnel.

The Hirschstetten Tunnel at the north end of the work zone is two lanes per tunnel direction. The Stadlau Tunnel to the south provides three lanes in each direction.

“The A23 would suffer massive traffic queues if all lanes were not available for the peak traffic commute,” explained Paul Grant of Lindsay Transportation Solutions. The Road Zipper System includes the QuickChange Moveable Barrier – QMB - and the Road Zipper transfer machine. These are T-shaped concrete barriers that connect to form a continuous wall. A transfer machine (vehicle) is used to move the concrete barriers laterally across the pavement, creating a moveable “zipper lane.”

“To create a work zone where lanes could be quickly opened and closed while still providing positive barrier separation between workers and motorists, ASFiNAG, the Austrian publicly-owned corporation which plans, finances, builds, maintains and collects tolls for the Austrian autobahns, chose our Road Zipper System. The barrier wall sections were brought from the Netherlands and installed over a three-night period by Marjo Salari Transport. The Barrier Transfer Machine, or BTM, was imported by Alpina and is operated on a nightly basis by subcontractor Sitec.”

Each night, the barrier wall is moved out and the work zone is expanded to make room for larger, more efficient equipment than would be possible without the extra work zone space.  Construction crews work efficiently knowing that they are protected from vehicle encroachments into the work zone by the concrete barrier.

The Austria tunnels project is the most recent European road works to use the Road Zipper System, which has been used successfully for road works in Italy, the Netherlands and the UK. In 2006, Lindsay Corporation acquired Barrier Systems, a company founded in 1984.

For more information on companies in this article

Related Content

  • Tackling congestion – with tough decisions
    July 8, 2016
    As editor of World Highways, information is provided on a great deal of revolutionary new traffic technology. Some of these new innovations offer major advantages in cutting congestion; smart systems that can regulate traffic flow or reduce risks for commuters. But it is worth remembering too that some of the solutions to urban transportation, as well as cutting urban pollution, have been around for a very long time. The humble bicycle is a highly efficient machine for transportation over comparatively shor
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Bertha restarts work on Seattle’s Alaskan Highway Viaduct project
    September 19, 2016
    Bertha, the tunnelling machine that is making its way under the US city of Seattle, has restarted work after nearly three weeks of scheduled maintenance downtime. The machine has been sitting more than 51m underground while crews replaced of 14 large cutting tools, according to the Washington State Department of transportation. Each tool weighs just under 275kg. Bertha - as the SR 99 tunnelling machine is called – is working on the Alaskan Way Viaduct Replacement Program. The Alaskan Way is an elevate
  • TBM for Gotthard Tunnel drive
    August 9, 2024
    A new TBM will be used to drive the new Gotthard Tunnel tube.