Skip to main content

Lindsay moveable barrier system earns MASH approval in the US

Lindsay Transportation Solutions has announced that its QuickChange Moveable Barrier Concrete Reactive Tension System (QMB-CRTS) has earned MASH approval. The system meets crash test and evaluation criteria contained in the American Association of State Highway and Transportation Officials’ Manual for Assessing Safety Hardware (MASH). MASH is the new standard for the crash-testing of safety devices for use on the National Highway System. It updates and replaces NCHRP Report 350. “We are pleased to inform
May 14, 2018 Read time: 2 mins

2438 Lindsay Transportation Solutions has announced that its QuickChange Moveable Barrier Concrete Reactive Tension System (QMB-CRTS) has earned MASH approval.

The system meets crash test and evaluation criteria contained in the American Association of State Highway and Transportation Officials’ Manual for Assessing Safety Hardware (MASH).

MASH is the new standard for the crash-testing of safety devices for use on the National Highway System. It updates and replaces NCHRP Report 350.

“We are pleased to inform our existing customers that the NCHRP350 TL4 barrier they installed in recent years now has passed MASH TL3,” said Chris Sanders, senior vice president of Lindsay Transportation Solutions. “All CRTS barriers connect seamlessly, providing fully compatible systems and spare parts.”

The QMB-CRTS is a non-anchored, portable or temporary concrete barrier used in managed lanes and construction applications. The company said that it is the first and only MASH compliant moveable barrier system that uses a machine to create real-time roadway reconfiguration while maintaining positive barrier protections between lanes. The system completed two MASH Level 3 (TL3) crash tests conducted by an independent testing facility, which were submitted to the Federal Highway Administration for approval in December.

If installed under the range of tested conditions, QMB-CRTS is now eligible for reimbursement under the federal-aid highway programme.

Last October, Lindsay’s Road Zipper median barrier system won an award of merit from the San Francisco Metropolitan Transportation Commission for its performance on the Golden Gate Bridge. The moveable median barrier, completed in January 2015, has reduced head-on collisions on the 2.7km-long bridge that handles around 2.5 million vehicles per month.

The barrier is a mechanical “zipper” that changes the configuration of the bridge’s six lanes twice daily to keep traffic flowing smoothly.

For more information on companies in this article

Related Content

  • Fischer caps it off with the FCC-B anchor
    March 12, 2025
    Variable anchoring depths of the FCC-B bridge cap anchor from German group fischer allow ideal adaptation to the acting load.
  • European transport safety programme
    March 29, 2019
    A new programme of transport safety measures has been drawn up for Europe, with funding having been secured. Called the Safer Transport Platform, this programme is being managed jointly by the European Investment Bank and European Commission. The plans call for a series of investments in transport safety, with a special focus on roads New financing measures form part of the Safer Transport Platform, a joint EC and EIB initiative. This will address investment needs in transport safety in Europe. At the TE
  • Double sided duty
    February 13, 2012
    Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.
  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat