Skip to main content

Lindsay installs first TAU-XR Xpress cushion

The installation of the TAU-Xpress repair crash cushion was in Las Vegas, Nevada, at the intersection of Highway 91 and Great Basin.
By David Arminas June 27, 2024 Read time: 1 min
The TAU-XR offers a range of transition options up to 52 inches (1m), ensuring maximum versatility in design

Lindsay said it recently installed its first unit of its MASH-tested TAU-XR Xpress repair crash cushion, designed for swift installation and rapid repair.

The installation of the TAU-XR was in Las Vegas, Nevada, at the intersection of Highway 91 and Great Basin.

Lindsay said that as a severe-duty, low-maintenance crash cushion, it delivers exceptional, long-term durability and low cost of ownership. TAU-XR ships fully assembled, allowing for an expedited installation onsite.

The TAU-XR offers a range of transition options up to 52 inches (1m), ensuring maximum versatility in design. Lindsay says that what sets the TAU-XR apart is its dual-rail configuration and attenuation that enables a straightforward, 30-minutes or less installation process and cost-effective repairs.

"The TAU-XR embodies our dedication to enhancing road safety while streamlining maintenance operations,” said Cole Hansen, vice president and general manager of infrastructure at Lindsay. "We're proud to offer a solution that has undergone rigorous testing for both asphalt and concrete applications, making the TAU-XR an ideal choice for contractors."

Lindsay Transportation Solutions manufactures equipment to improve road safety and keep traffic moving on the world’s roads, bridges and tunnels, through the Barrier Systems, Road Zipper and Snoline brands.

For more information on companies in this article

Related Content

  • How data mining and the intelligence it creates is helping sites run more effectively and efficiently
    December 13, 2022
    In this, the third in our series of top-level roundtable discussions led by World Highways, editor Mike Woof and roundtable host Nadira Tudor talk machine control technology with three world-class experts from Leica Geosystems (part of Hexagon), Topcon, and Trimble. There’s never been a more exciting time to be in construction as innovation makes us more productive, more efficient, more sustainable, and better connected. Autonomy means opportunity.
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • Swift and versatile solutions from Versilis
    January 9, 2019
    Automated access control is not only safer for road crews but reduces the time and cost of deployment of signage for access and traffic control.
  • IRF crash cushion webinar
    October 12, 2012
    Not enough road agencies and highway engineers understand the questions to ask regarding site-specific conditions, design performance criteria and reusability requirements of crash cushions when making purchasing decisions. To address these questions, IRF held a webinar attended by over 170 highway and safety professionals in 18 countries. The webinar reviewed crash cushion applications, described current performance-based standards (NCHRP 350/MASH/EN1317) and presented the recommendations to allow road aut