Skip to main content

Keep on truckin’ with X-Cone

The X-Cone, from Franz Janschitz, is predominantly aluminium construction weighing around 600kg.
By David Arminas July 21, 2020 Read time: 1 min
Driver only: the X-Cone system is all loaded up with 224 cones

X-Cone is a fully automated traffic-cone management system offering increased worker safety and maximum efficiency for contractors, according to the manufacturer, Franz Janschitz.

By using the illuminated 177mm (7″) touchscreen control unit, the driver can select the desired cone spacing, which can be set from 10m upwards. Once set, X-Cone deploys and collects traffic cones without manual intervention.

X-Cone has a lightweight, predominantly aluminium, construction weighing around 600kg and with a life expectancy of 10 or more years but requires minimal maintenance.

X-Cone has a maximum load capacity of 224 traffic cones, dependent upon cone type and size. It has an operating rate of six traffic cones per minute, allowing for 1km of cones at 36m spacing to be deployed or collected in around five minutes.

Also, cones can be deployed and collected from either side of the vehicle; this allows for maximum flexibility when working with or, where appropriate to do so, against the traffic flow.

Operators are not required to work on the loading bay of the vehicle and the system can be operated by one person only – the driver.

Related Content

  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o
  • SWARCO prism signs for Highways England
    September 8, 2020
    The deal is part of a phased scheme of a diversion routes over the next few years.
  • BOMAG’s new asphalt paver range
    November 26, 2021
    Road construction machinery specialist BOMAG is introducing a new asphalt paver range. In addition, the company is also launching its BOMAG Advanced Pave system, which is said to be a digital co-pilot package
  • Illuminated road studs deliver tidal flow safety
    February 14, 2012
    Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.