Skip to main content

Keep on truckin’ with X-Cone

The X-Cone, from Franz Janschitz, is predominantly aluminium construction weighing around 600kg.
By David Arminas July 21, 2020 Read time: 1 min
Driver only: the X-Cone system is all loaded up with 224 cones

X-Cone is a fully automated traffic-cone management system offering increased worker safety and maximum efficiency for contractors, according to the manufacturer, Franz Janschitz.

By using the illuminated 177mm (7″) touchscreen control unit, the driver can select the desired cone spacing, which can be set from 10m upwards. Once set, X-Cone deploys and collects traffic cones without manual intervention.

X-Cone has a lightweight, predominantly aluminium, construction weighing around 600kg and with a life expectancy of 10 or more years but requires minimal maintenance.

X-Cone has a maximum load capacity of 224 traffic cones, dependent upon cone type and size. It has an operating rate of six traffic cones per minute, allowing for 1km of cones at 36m spacing to be deployed or collected in around five minutes.

Also, cones can be deployed and collected from either side of the vehicle; this allows for maximum flexibility when working with or, where appropriate to do so, against the traffic flow.

Operators are not required to work on the loading bay of the vehicle and the system can be operated by one person only – the driver.

Related Content

  • The paperless construction site
    August 9, 2019
    Digitalization is changing the construction industry faster than expected. Automation, additional sensors and the networking of machines make it possible to exploit optimization potential and noticeably increase productivity. However, despite innovative working methods and digitization, the road construction process is still mainly based on one medium: paper. Paper can be used for a wide variety of purposes and offers unlimited flexibility. Construction schedules, work schedules, work sheets, mix orders
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • BarrierGuard 800 keeps key U.S. bridge open
    April 11, 2013
    BarrierGuard 800 from Highway Care is said to be preventing the closure of a vital highway bridge in the United States. As a critical part of the US national infrastructure, the Sarah Mildred Long Bridge services the Portsmouth Naval Shipyard. The link allows the transporting of spent nuclear fuel and heavy freight bound to and from the naval shipyard, with an average of 15,000 vehicles per day crossing this structurally deficient bridge. The railing along the Sarah Mildred Long Bridge had begun to deterio
  • Versatile small construction equipment
    February 9, 2012
    Smaller construction equipment offers versatile options, particularly on highway repair and maintenance projects. Patrick Smith reports. Visitors to any highway construction site across the world will see a sizeable amount of utility equipment in action carrying out a variety of tasks. Indeed, because of its smaller, more compact size, such multi-task equipment is essential when repair and maintenance projects are being carried out, particularly in urban areas where space may be limited.