Skip to main content

Kee Safety gets Klamped over guardrails on highways projects

Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects. The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations. There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock th
March 10, 2015 Read time: 1 min
8030 Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects.

The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations.

There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock the respective fitting safely and securely onto the tube to create a strong, stable and safe guardrail structure.

Kee Klamp handrails and guardrails have been installed in various locations across the UK road network.

For more information on companies in this article

Related Content

  • Fugro-TRL alliance to supply integrated highways asset management solutions
    June 5, 2014
    Fugro has signed an agreement with TRL, the UK-based, globally renowned transport research firm and consultancy, to merge data collection and asset management expertise for highways clients worldwide. In teaming up, Fugro and TRL aim to deliver an enhanced range of specialist services, efficiently integrated to maximise value for the asset management programmes of government departments and highways authorities. Clients will have access to world class asset management proficiency and surveying capabilities
  • Shrewd construction
    January 2, 2013
    David Williams is director of Kijlstra UK, one of the leading European manufacturers and suppliers of drainage solutions. The Group has a turnover in excess of €150 million and sites in numerous locations throughout Western Europe. Ever since Sir John Egan kick-started the Rethinking Construction movement more than a decade ago, designers, contractors and suppliers have been trying to find ways of improving site safety, cutting waste and generally improving efficiency in the construction process. “There has
  • Special formwork solution for tricky Orinoco project
    April 24, 2013
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood plain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shape with the Venezuelan government investing in the showcase project at Caicara del Orinoco. The bridge will have an overall length of 11.125km on completion, which is scheduled for 2015. The main bridge is 2.28km long, and the roadway is 55m above
  • Volvo’s 75tonne EC750E optimises productivity and profitability
    March 14, 2016
    Fuel efficiency, increased productivity and better performance ensure the EC750E crawler excavator from Volvo Construction Equipment delivers maximum return on investment. The 75-tonne EC750E offers power and stability to deliver high capacity in most applications. Powered by Volvo’s Tier 4 Final/Stage IV compliant D16 engine, the heavy-duty excavator delivers increased horsepower of 374 kW/502 hp. The EC750E offers an electro-hydraulic system, optimised to operate in harmony with the robust engine, d