Skip to main content

Kee Safety gets Klamped over guardrails on highways projects

Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects. The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations. There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock th
March 10, 2015 Read time: 1 min
8030 Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects.

The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations.

There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock the respective fitting safely and securely onto the tube to create a strong, stable and safe guardrail structure.

Kee Klamp handrails and guardrails have been installed in various locations across the UK road network.

For more information on companies in this article

Related Content

  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Fuel alternatives for the future
    July 25, 2022
    Engine firms are working to ensure engines can run on alternative fuel types
  • ARRB Systems' network-level continuous friction testing
    November 20, 2024
    Pavement safety assessments have traditionally focused on discrete low-density friction assessments using proven technology. But more detailed investigations and analysis are now feasible through improved technologies, explains Simon Tetley of ARRB Systems*.
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon