Skip to main content

Kee Safety gets Klamped over guardrails on highways projects

Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects. The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations. There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock th
March 10, 2015 Read time: 1 min
8030 Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects.

The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations.

There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock the respective fitting safely and securely onto the tube to create a strong, stable and safe guardrail structure.

Kee Klamp handrails and guardrails have been installed in various locations across the UK road network.

For more information on companies in this article

Related Content

  • Workszone design and planning software
    March 6, 2012
    Managing utility works effectively is important, given that digging up roads and then patching them can dramatically cut the life of a road surface. New software tools make this process easier to manage effectively and Bentley Systems is extending its Expert Designer V8i package to include water, gas, and communications infrastructure, in addition to electric utilities. This allows utility firms and engineering contractors using Expert Designer V8i to boost the efficiency of utility network design projects.
  • Cummins fuel-agnostic engine platform delivers low-to-zero carbon fuel capability
    March 10, 2023
    Heavy-Duty Hydrogen, Natural Gas And Advanced Diesel Engines To Align With Tier 5
  • New NY Bridge - Tappan Zee - main span towers poured
    December 16, 2016
    One of the largest US infrastructure projects is nearer completion after recent topping out of the eight main span towers of the New NY Bridge. The final concrete pour was in mid-December and all piles - more than 1,000 - have been installed in Hudson River. To date, 3,000 roadway panels for the approaches - making 5.5km in length - have been installed, according to the New York State Thruway Authority, owner of the New NY Bridge project. The New NY Bridge, also called the Tappan Zee Bridge, is on tra
  • Sandvik debuts CS550 cone crusher
    March 10, 2017
    Sandvik’s CS550 cone crusher, which is being launched globally at CONEXPO-CON/AGG 2017, is an extremely powerful secondary stage crusher for up to 750tonne applications. In addition to flexibility and sheer tonnage, it offers advanced automation and maintenance features for maximal productivity and uptime.