Skip to main content

Kee Safety gets Klamped over guardrails on highways projects

Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects. The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations. There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock th
March 10, 2015 Read time: 1 min
8030 Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects.

The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations.

There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock the respective fitting safely and securely onto the tube to create a strong, stable and safe guardrail structure.

Kee Klamp handrails and guardrails have been installed in various locations across the UK road network.

For more information on companies in this article

Related Content

  • Iterchimica’s Gipave used in major UK road trial
    October 3, 2024
    This is the first time graphene-enhanced Gipave has been applied on the UK’s strategic road network - major highways and motorways - and follows ongoing trials on local roads.
  • New US pavers coming to market
    July 7, 2022
    New US asphalt pavers are now coming to market
  • Aggregates production innovations delivering efficiency
    August 1, 2017
    EvoQuip, the newest division of Terex Corporation, is launching a Cobra 230 impact crusher later this year, to sit alongside the Cobra 260. The 24tonne machine will offer a production capacity of 140-150tonnes/hour in asphalt and construction recycling. The Cobra 230 is 11.3m long and 2.46m wide, or 5.15m wide with a side conveyor. It features a quick set-up time and the machine can be moved onsite without having to stop the crusher. Keestrack says that its novel H4 tracked cone crusher is light and compact
  • New drilling and blasting technology aids efficient quarrying
    April 13, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.