Skip to main content

Kee Safety gets Klamped over guardrails on highways projects

Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects. The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations. There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock th
March 10, 2015 Read time: 1 min
8030 Kee Safety, based in the UK but with global offices, offers Kee Klamp fittings for a range of guardrail applications on highways projects.

The Kee Klamp system securely joins structural steel tube into almost any conceivable configuration across a variety of angles and is also capable of accommodating on-site variations.

There is no need for installers to weld or fabricate because Kee Klamp components can be installed using a standard hex key, with each fitting incorporating an internal set screw to lock the respective fitting safely and securely onto the tube to create a strong, stable and safe guardrail structure.

Kee Klamp handrails and guardrails have been installed in various locations across the UK road network.

For more information on companies in this article

Related Content

  • Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements
    January 6, 2017
    Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • IRF and REAAA showcase solutions to global road and transport needs
    June 8, 2017
    Free-flow Electronic Toll Services have emerged as a reliable, safe and environmentally sustainable way of collecting road user charges, presenting key benefits over stop-and-go methods. ETS are now a mature market with key lessons learned from successfully addressing operational, technological, financial and regulatory principles. Having high-quality road infrastructure is important to boost country and transport sector competitiveness. Road infrastructure is always in need of funding aimed to build new in
  • Improved vehicle detection
    February 28, 2012
    New technology from sensor manufacturer SICK UK allows the use of the latest LMS111 series of laser sensors improved vehicle detection capabilities. The new system gives high accuracy with minimal error sensing for security, safety and presence detection on highways duties. SICK says that the LMS111 avoids the risk of false signals and can be used in a broad range of applications while being available at a competitive price.