Skip to main content

Irish orders for special surfaces

Over the past few months, Lagan Construction, the primary partner of Ennis Prismo Traffic Safety Solutions in Ireland, has secured contracts to install more than 60,000m² of the international road marking manufacturer's high-friction road surfacing materials. The contracts were awarded following earlier trials using Ennis Prismo's BBA-HAPAS [British Board of Agrément-The Highways Authorities Product Approval Scheme]-approved Type 1 material Tyregrip on trial sites for Ireland's National Roads Authority (NRA
February 6, 2012 Read time: 2 mins
Ennis Prismo's Tyregrip material has been used on trial sites for Ireland's National Roads Authority
Over the past few months, 2340 Lagan Construction, the primary partner of 1394 Ennis Prismo Traffic Safety Solutions in Ireland, has secured contracts to install more than 60,000m² of the international road marking manufacturer's high-friction road surfacing materials.

The contracts were awarded following earlier trials using Ennis Prismo's BBA-HAPAS [British Board of Agrément-The Highways Authorities Product Approval Scheme]-approved Type 1 material Tyregrip on trial sites for Ireland's National Roads Authority (NRA).

The most recent of these trials was on a steep downhill section approaching the junction of a very busy main road near the capital Dublin, where 21 fatalities have occurred over the past three years.

The road is often frequented by heavy goods vehicles (HGVs) from a nearby quarry, and the asphalt surface, when combined with rain and speeding vehicles, was clearly not up to the job of stopping vehicles quickly enough in order to avoid accidents.

A 2,000m² downhill area approaching the main junction at the black spot was installed over a two-day period in September 2009, in difficult traffic management conditions.

Due to the unusually steep incline, Ennis Prismo recommended the addition of cellulose fibres in order to prevent the epoxy bonding agent running down the gradient before it had the chance to initially cure and secure the high friction surfacing in place.

The trial is currently ongoing but the NRA, which is set to take full responsibility from local highway councils for the design and specification work for all of Ireland's roads in 2011, has already suggested that if successful it will specify Tyregrip for the entire region.

For more information on companies in this article

Related Content

  • Cats eyes from Clearview set the tone at Switch Island in the UK
    February 23, 2018
    Cats eyes, which light up in response to changing traffic lights, will be used for the first time in the UK at a motorway junction. Highways England, the government agency, is installing around 170 of the LED road studs at Switch Island, one of England’s busiest motorway junctions – used by over 90,000 vehicles every day. Installation is expected to take around a year to complete.
  • Epoxy for Ethiopia
    March 10, 2022
    Paving trials using epoxy resins in the Netherlands and New Zealand could lead to similar paving in Ethiopia, reports Kristina Smith.
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Advances in road markings
    March 16, 2012
    Recent months have seen many major and vital road marking projects and products completed and tested in different parts of the world. Guy Woodford looks at some of them in Europe, North America, the Middle East and Africa. The London borough of Kensington and Chelsea now has one of the most dramatic streetscape designs in Europe. Exhibition Road’s striking chequered granite design, featuring a single surface running from South Kensington Station to Hyde Park and the full width of the road from building to b