Skip to main content

Hitex launches BBA certified Puma road surfacing and marking range

Hitex International, a global provider of road safety and surfacing solutions, has introduced the Puma range of modified MMA (methyl methacrylate) high-friction surfacing and road marking materials. Hitex says that they are quicker and easier to apply and allow contractors to control the curing process to suit available workforce. This has the potential to speed up highway works and reduce traffic congestion.
February 27, 2017 Read time: 2 mins
Hitex’s Puma range of high-friction surfacing

7819 Hitex International, a global provider of road safety and surfacing solutions, has introduced the Puma range of modified MMA (methyl methacrylate) high-friction surfacing and road marking materials.

Hitex says that they are quicker and easier to apply and allow contractors to control the curing process to suit available workforce. This has the potential to speed up highway works and reduce traffic congestion.

“This is the highway industry’s first PU modified MMA technology,” said John Lloyd, managing director at Hitex Traffic Safety.

“Puma provides a less disruptive solution that will maximise productivity and efficiency for contractors working under road rental schemes by reducing the time that roads or lanes have to be closed. It is workable in any temperature environment and delivers a longer service life as it breathes with the road surface without peeling at the edges, which is a common characteristic of other, more brittle systems.”
 
PumaGrip Type 1 is a high-friction, anti-skid surfacing material that is extremely energy efficient as it requires neither gas nor diesel heating. It can be laid directly onto old and new asphaltic surfaces without the need for expensive equipment and vehicles. Importantly, it provides catalyst-controlled curing within 30-60 minutes for highly trafficked, high stress areas including sharp bends, junctions and motorway slip roads as well as approaches to roundabouts, pedestrian crossings and accident black spots.
 
PumaBrite road markings use similar modified MMA technology combined with lead-free pigments, glass beads, aggregates and fillers. Available in a range of performance levels for flat lines or type 2 profiled wet night markings, they are fast and easy to apply with catalyst controlled curing within 5-30 minutes, depending on application method. The material can be used for a wide range of applications such as centre and edge lines, junction markings and smaller scale works such as car parks and factories.
 
PumaTrack is an easy-to-install roller-applied surface treatment designed for use on cycle tracks and walkways. It comes in a wide range of colours and is engineered to achieve the highest levels of durabillity, adhesion and colour stabillity.  
 
Hitex says that its Puma range can be modified for use in any climate and environment. PumaGrip Type 1 material is British Board of Agreement (BBA) certified covering products and approved installers and is regulated in the UK under the Highways Agency BBA HAPAS scheme.

For more information on companies in this article

Related Content

  • 3M and 407 ETR have it taped on a major motorway near Toronto
    August 1, 2019
    Canadian motorway concessionaire 407 ETR, in partnership with 3M Canada, is testing 3M's pavement marking tapes for Advanced Driver Assistance Systems on 2.5km of lanes. The initiative is part of the 407 ETR Living Labs programme of innovation to promote safety and next-generation transportation along the 140km route that opened in 1997 and was extended last year. King's Highway 407 is a tolled 400-series highway in the province of Ontario comprising a privately leased segment and publicly owned segm
  • Kleemann: Mobile Screen for Coarse Elements MOBISCREEN MSS 802(i) EVO
    February 21, 2023
    More flexibility and efficient on site
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl
  • In control - with machine control technology
    June 21, 2016
    Advances with machine control technologies are providing major benefits right across the construction sector - Mike Woof writes With the massive bauma 2016 exhibition now having run its course, the construction sector look set to benefit from a range of new machine control technologies. These systems are being offered across a range of different segments in the equipment sector. Bulldozing was one of the first portions of the earthmoving segment to benefit from machine control systems, but a vast array o