Skip to main content

Hammerglass barriers for Förbifart Stockholm

Swedish firm Hammerglass is supplying its transparent PostFree sound barriers for the bypass.
By David Arminas August 20, 2021 Read time: 3 mins
The PostFree system is held by a steel plate, or a steel “foot”, that is embedded into or bolted onto the cement curb or a bridge’s superstructure

Swedish glazing specialist Hammerglass is supplying around 1,000 transparent sound barrier panels to the Stockholm Bypass – E4 Förbifart Stockholm - project over 18-months.

The Hjulsta part of the bypass consists mainly of bridges and road junctions which makes sound barriers essential for the residential areas.

Hammerglass says that it is the only supplier of what the company calls its PostFree system. The development process was made possible thanks to the company’s 20 years producing only customer-specific unbreakable glazing solutions which includes panels for the cabins of heavy construction machinery.

For the Stockholm Bypass project, the panels have a “bent” side and need no posts for installation. They will be part of a 4km-long wall although some sections will include other sound absorbing materials in accordance with the client’s wishes.

A panel weighs less than half that of a similarly sized glass sheet
A panel weighs less than half that of a similarly sized glass sheet

Each sheet is, to the human eye, totally transparent. The company says that people prefer to see through a sound barrier because it then feels less like a physical barrier. It is also not then “hiding” what is going on behind the structure, thereby adding to the viewer’s sense of security.

However, while the screen is transparent to humans, it also comes in three shades of green for a visually pleasing effect. There is also enough internal patterns which are not noticeable to humans but are to birds, meaning they can see the panels and not fly into them.

A Hammerglass sheet is around 1.5m wide and between 2-6m high. Around 50cm of one side is bent, or curved, to a 90° angle. The company also claims that each sheet is unbreakable. The most common sheet thickness for highway use is 12mm. For railroad applications the thickness is usually 15mm. Hammerglass says one of its PostFree panels weighs less than half that of a similarly sized glass sheet. Its lightness makes installation easier and faster than for glass.

A sheet’s effectiveness is measured in by Rw - or a weighted sound reduction index. This is an International Organisation for Standardisation (ISO) rating and part of the ISO 140 (Acoustic) family. The 12mm thickness has an Rw of 34dB, meaning the client can expect the noise it wants to block will be reduced by 34 decibels.

PostFree panels come in three shades of green
PostFree panels come in three shades of green

The PostFree system is fixed into position by a steel plate, or a steel “foot”, that is embedded into or bolted onto the cement curb, road section or a bridge’s superstructure. Each panel slightly overlaps the next one to it and is secured using several fixing bolts.

Importantly, the polycarbonate hard-coated surface has a layer of silicon oxide that makes it very easy to clean off graffiti and dirt which helps reduce maintenance costs. As well, a panel provides 99.96 % UV-protection. It will not cloud or discolour or undergo any other change in optical quality over time. The company says that a sheet’s estimated service life is more than 40 years.

Hammerglass has already delivered the unbreakable noise barrier panels for use in other projects by the Sweden’s Transport Administration which, in 2018, held a public procurement process for a noise barrier that needed no posts for installation. Hammerglass says it was the only company to take on the challenge and came up with their solution now being used by the Administration.

To see a demonstration of the durability of the company’s panels, click here.

For more information on companies in this article

Related Content

  • ACEpro: Operator Friendliness Is Key to Enhanced Intelligent Compaction System
    December 18, 2024
    LANGENTHAL, Switzerland – Ammann has upgraded its advanced Intelligent Compaction system, ACEpro, to make it easier than ever for operators to access the built-in technology. The enhanced system is being integrated into Ammann ARP 75 and ARP 75 C Pivot-Steer Tandem Rollers.
  • Nuphalt is well-prepared to meet the growing challenge for road repairs
    November 21, 2023

    2023 is proving to be a great year for the Nuphalt Group. Beginning in January with a move into their brand-new, purpose-built facility in Rugby, UK, utilising new mezzanine floors (increased manufacturing space by 50%), adding state-of-the-art laser cutting equipment and, of course, bringing everything under one roof. And with 100 kW of PV solar power up there, that’s no ordinary roof! The move to a more self-sufficient premises is all part of Nuphalt’s vision for a greener future.

  • Komatsu PC490HRD-11 K100 goes to work
    September 20, 2021
    In June 2021, Komatsu announced a new variant of their PC490HRD-11 high reach demolition machine featuring a brand-new boom connection system. Named “K100”, the new system allows the operator to change the configuration of the machine singlehandedly in only a few minutes, without leaving the comfort of the operator cab. One of the first of these new machines recently went to work in Bradford, UK.
  • John Deere Operations Center™ Construction
    March 5, 2024
    The digital platform for solutions for optimising processes, machinery and services