Skip to main content

Geveko launches Thermo Primer to replace PREMARK primer

Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer. The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09
February 8, 2018 Read time: 1 min

2447 Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer.

The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09: Environmental Hazard and the GHS08: Health Hazard are not on the Thermo Primer due to the improved formulation, noted the company.

For more information on companies in this article

Related Content

  • Multiple role machine
    February 15, 2012
    The introduction of a new backhoe loader line is a major development for Case, Mike Woof reports. Case is introducing its new backhoe loader line-up for the European market, which offers key performance improvements. There are four models being introduced, the 695ST, 590ST, 580ST and 580T, aimed at different market segments and intended to encompass the entire range of customer requirements. This is an important launch for CNH, which has been offering a fully-integrated backhoe loader in its line-up since 1
  • Novel twin layer paving technology saves time
    February 28, 2012
    German paver specialist Vögele reports that market acceptance is growing for its novel twin layer paving technology
  • Benninghoven | Reducing the carbon footprint in asphalt production
    May 5, 2023
    Working more efficiently with sustainable and economical technologies is the challenge of today and tomorrow. Solutions from Benninghoven lower emissions and secure the future of asphalt mixing plant sites.
  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.