Skip to main content

Geveko launches Thermo Primer to replace PREMARK primer

Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer. The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09
February 8, 2018 Read time: 1 min

2447 Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer.

The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09: Environmental Hazard and the GHS08: Health Hazard are not on the Thermo Primer due to the improved formulation, noted the company.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Extraction operation benefits from haul road improvement
    May 23, 2014
    The trial of a novel compound at a site in Chile has shown how structural improvements can be achieved for dirt road applications Although the Barrick Gold Pascua Lama operation is a surface mining site, the experience with this technology is equally applicable for use on haul roads in large quarries or for dirt roads expected to carry heavy loads. This is of particular importance for transport in remote areas where large loads such as pre-cast bridge sections or girders for example may have to be carrie
  • Road markings essential for road safety
    March 16, 2012
    Road markings, along with laying and testing equipment, are all essential to make sure drivers get clear instructions. Patrick Smith reports Road markings are as important as signs, with longitudinal markings informing and warning road users of approaching situations that will require them to take some form of action.