Skip to main content

Geveko launches Thermo Primer to replace PREMARK primer

Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer. The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09
February 8, 2018 Read time: 1 min

2447 Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer.

The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09: Environmental Hazard and the GHS08: Health Hazard are not on the Thermo Primer due to the improved formulation, noted the company.

For more information on companies in this article

Related Content

  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • A new Marini asphalt plant for Strabag
    April 20, 2023
    Austria’s major contractor Strabag recently decided to purchase a new Marini Class Tower asphalt plant
  • New barrier, crash cushion and access control technology will benefit road user safety
    October 26, 2012
    Protecting road users, with barriers, crash cushions or access control systems, is crucial for network safety - Mike Woof writes Tough regulations are now in place in Europe and the US, requiring road authorities to provide safer road infrastructure than in the past. Technologies to reduce the severity of vehicle impacts against obstructions or redirect vehicles into the roadway should help cut injuries amongst drivers and passengers alike. The specifications for the use of crash cushions and barriers can v