Skip to main content

Geveko launches Thermo Primer to replace PREMARK primer

Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer. The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09
February 8, 2018 Read time: 1 min

2447 Geveko Markings has introduced Thermo Primer, an improved one component primer replacing PREMARK Primer.

The company said that Thermo Primer secures strong bonding between thermoplastic markings and surfaces with little or no bitumen. With the Thermo Primer you get faster drying time of the primer, so the application of the markings can be finished faster. The 4litre tin is also more easily opened. Also, Thermo Primer will be available in 20litre cans soon. From an environmental perspective, the GHS09: Environmental Hazard and the GHS08: Health Hazard are not on the Thermo Primer due to the improved formulation, noted the company.

For more information on companies in this article

Related Content

  • Tough covers
    February 7, 2012
    Innovative solutions have been developed to meet a need for long-lasting yet low cost access cover applications by Structural Science Composites (SSC). According to SSC its new products outperform rival materials in terms of safety and security as well as whole-life costs. The new composite covers meet requirements for strong covers that can cope with growing traffic densities and tough constraints on financial and operational resources for road building and maintenance. The D400 vehicular grade cover and B
  • Berco bounces back
    December 16, 2021
    The global Italian undercarriage manufacturer is forging ahead with a major lean manufacturing transformation that is already seeing results. David Arminas reports from the company’s 500,000m² plant in Copparo.
  • Higher productivity, lower cost asphalt plants
    February 14, 2012
    Manufacturers are producing innovative asphalt equipment, and operators are benefiting from this as Patrick Smithreports. Asphalt plant manufacturers and operators are understandably placing great emphasis on higher productivity but with lower costs. At the same time they are aware of environmental issues and the ever-increasing use of recycled material in mixes.
  • Volvo CE’s N-Ice work
    June 13, 2012
    Volvo Construction Equipment's (VCE's) snowfighting motor graders were used to clear snow from highways in the Canadian province of Saskatchewan – which can experience arctic lows of -20° C in winter. "The lighting and visibility on these graders is excellent. As soon as it stops storming, regardless of the time of day or night, we are out working. We couldn't do that with the other grader brands the municipality has owned in the past," says Don Dancey, an operator in the rural municipality of Star City, no