Skip to main content

FlexiPole installed on famous Clifton Bridge

A number of Ritherdon passively-safe electroluminescent (EL) FlexiPole signpost systems have now been installed on the historic Clifton Suspension Bridge in Bristol, west England. Completed in 1864, the Bridge was originally designed to provide a safe crossing across a gorge for horse-drawn traffic; the chosen method of transport in the 19th century. However it now accommodates 21st century commuter traffic with in excess of 11,000 vehicles crossing the Bridge every day. The custodians of Clifton Suspension
April 11, 2013 Read time: 2 mins

A number of Ritherdon passively-safe electroluminescent (EL) FlexiPole signpost systems have now been installed on the historic Clifton Suspension Bridge in Bristol, west England.

Completed in 1864, the Bridge was originally designed to provide a safe crossing across a gorge for horse-drawn traffic; the chosen method of transport in the 19th century. However it now accommodates 21st century commuter traffic with in excess of 11,000 vehicles crossing the Bridge every day.

The custodians of Clifton Suspension Bridge, who are backed by the Heritage Lottery Fund, expressed a need for an illuminated ‘keep left’ signpost that would be functional, durable and eco-friendly, but also fit in visually with the surroundings of the World Heritage Site.

5614 Ritherdon FlexiPoles were said to be chosen to grace the tolls at the entrance to the famous Bridge for their minimalistic appearance and low visual impact on the heritage of the site. They were also preferred, says Ritherdon, due to their EL material being more visible than any alternative light sources, especially in the adverse weather conditions that the Clifton Suspension Bridge is prone to, due to the height of the crossing over the Avon Gorge.

EL is described by Ritherdon as an optical and electrical phenomenon in which a material emits light in response to an electric current passed through it and, as it uses organic phosphor, is said by Ritherdon to be the most efficient light source on the planet.

Ritherdon claim that deploying an EL sign will save €118.95 [£100] a year and reactivate maintenance for a typical 300mm illuminated sign, with an additional saving of €17.84 [£15]-per-annum on energy which equates to 60kg of CO2. The Lancashire county, north-west England-based firm says potential savings are much greater for larger signs.

For more information on companies in this article

Related Content

  • Volvo CE’s new L250H wheeled loader uses OptiShift to boost performance, safety and fuel economy
    March 7, 2014
    Volvo Construction Equipment’s new Tier 4 Final/Stage IV-compliant L250H wheeled loader has been designed to perform heavy tasks with better performance, safety and fuel economy levels using the manufacturer’s OptiShift technology. In North America the L250H is ideally suited to working with on-highway trucks, and the L250H will load a 22.7tonne tri-axle on-highway truck in just two passes. That’s two full buckets for one full truck says Volvo.
  • Reflective road markings improve visibility, safety
    February 13, 2012
    Retroreflectivity plays a vital role when it comes to helping drivers follow road markings clearly in the dark as Patrick Smith reports. In many instances road markings are as important as road signs, offering information about the roads being travelled and the actions drivers should or should not be taking. Toady there is a wide variety of materials available for such markings and these include paints, cold applied plastics, thermoplastic, self-adhesive tapes, modified epoxy resins and raised pavement mark
  • SWARCO’s sustainable SOLIDPLUS glass beads
    February 1, 2023
    Since last year, SWARCO’s SOLIDPLUS next generation of glass beads have been made in one of the most state-of-the-art and efficient facilities for the production of reflective glass beads.
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill