Skip to main content

FlexiPole installed on famous Clifton Bridge

A number of Ritherdon passively-safe electroluminescent (EL) FlexiPole signpost systems have now been installed on the historic Clifton Suspension Bridge in Bristol, west England. Completed in 1864, the Bridge was originally designed to provide a safe crossing across a gorge for horse-drawn traffic; the chosen method of transport in the 19th century. However it now accommodates 21st century commuter traffic with in excess of 11,000 vehicles crossing the Bridge every day. The custodians of Clifton Suspension
April 11, 2013 Read time: 2 mins

A number of Ritherdon passively-safe electroluminescent (EL) FlexiPole signpost systems have now been installed on the historic Clifton Suspension Bridge in Bristol, west England.

Completed in 1864, the Bridge was originally designed to provide a safe crossing across a gorge for horse-drawn traffic; the chosen method of transport in the 19th century. However it now accommodates 21st century commuter traffic with in excess of 11,000 vehicles crossing the Bridge every day.

The custodians of Clifton Suspension Bridge, who are backed by the Heritage Lottery Fund, expressed a need for an illuminated ‘keep left’ signpost that would be functional, durable and eco-friendly, but also fit in visually with the surroundings of the World Heritage Site.

5614 Ritherdon FlexiPoles were said to be chosen to grace the tolls at the entrance to the famous Bridge for their minimalistic appearance and low visual impact on the heritage of the site. They were also preferred, says Ritherdon, due to their EL material being more visible than any alternative light sources, especially in the adverse weather conditions that the Clifton Suspension Bridge is prone to, due to the height of the crossing over the Avon Gorge.

EL is described by Ritherdon as an optical and electrical phenomenon in which a material emits light in response to an electric current passed through it and, as it uses organic phosphor, is said by Ritherdon to be the most efficient light source on the planet.

Ritherdon claim that deploying an EL sign will save €118.95 [£100] a year and reactivate maintenance for a typical 300mm illuminated sign, with an additional saving of €17.84 [£15]-per-annum on energy which equates to 60kg of CO2. The Lancashire county, north-west England-based firm says potential savings are much greater for larger signs.

For more information on companies in this article

Related Content

  • SBS modified asphalt delivers added benefits
    February 17, 2012
    Special additives are used in asphalt mixes to give them added benefits as Patrick Smith reports
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained.
  • Latest VMS keeps world’s motorists moving safely
    April 10, 2013
    VMS for what is thought to be the longest road tunnel in the Middle East, and the installation of the latest VMS technology in Canada’s oldest national park to help motorists travelling through it are among the projects discussed by Guy Woodford. A large volume of VMS from Italian firm Solari has been installed in the new 4.2km-long Zayed Street Tunnel in Abu Dhabi – thought to be the longest in the Middle East. The Solari VMS supply consisted of 204 lane control signs, with Red, Yellow and Green LED pre-de
  • Rebuilding a scenic route in South Africa
    April 20, 2018
    Equipment from Wirtgen has played a key role in the rehabilitation of a major route in Cape Town. The scenic Camps Bay Drive provides access to Camps Bay and Hout Bay Based on the project brief and geometric analysis, Camps Bay Drive required widening to cope with high volumes of tourist traffic and MyCiti buses. In order to minimise the impact on traffic, the design brief targeted construction outside the summer peak tourist season and also required investigation into shortened construction periods. The