Skip to main content

Evonik helps rumble strips prevent wrong-way driving

Each year in Germany, up to 80 accidents are caused by drivers on the wrong side of the road, of which many are on- and off-ramps to a main highway. To prevent this, a pilot test has been devised to alert drivers to their wrong-way direction. Cold plastic, one-sided rumble strips are being installed on the road surface within a 100cm-wide by 2cm-deep recessed groove across the lane. The specially shaped cold plastic coating with an uneven, rough bulge gives drivers a strong tactile and acoustic signal, aler
December 11, 2015 Read time: 2 mins
Each year in Germany, up to 80 accidents are caused by drivers on the wrong side of the road, of which many are on- and off-ramps to a main highway

To prevent this, a pilot test has been devised to alert drivers to their wrong-way direction. Cold plastic, one-sided rumble strips are being installed on the road surface within a 100cm-wide by 2cm-deep recessed groove across the lane.

The specially shaped cold plastic coating with an uneven, rough bulge gives drivers a strong tactile and acoustic signal, alerting them of the hazard situation. But drivers who are driving in the correct direction will notice only a slight bump in the road.

A prototype was tested on the former military airbase in Rothenburg, a town in Germany’s Upper Lusatia region and close to the Polish border.

A 32m-long test route consisting of five strips was set up. For the diagonal markings, a cold plastic material developed from Limboplast, made by 4009 Evonik Industdries, especially for applying to the grooves in the road surface.

Limboplast for rumble strips is based on 1659 Degaroute from 337 Swarco Limburger Lackfabrik, said Jochen Henkels, business director for road marking and flooring at Evonik.

The hard, abrasion-resistant material will also protect the road surface where the rumble strips are applied and the edges formed by the cutting process against premature wear and tear.

A second test track will soon be set up, he said. It takes three to four hours to install the system that will likely cost around €3,500 for each junction.

For more information on companies in this article

Related Content

  • New drilling and blasting technology aids efficient quarrying
    March 15, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.
  • Help is on hand from Roadtec’s Guardian Telematics
    August 17, 2015
    Telematics is giving contractors a greater oversight of the location and performance of their machinery In simple terms, telematics is any integrated use of telecommunications and ICT (information and communications technology). It concerns the sending, receiving and storing of information via telecommunication devices. Typically, this is in conjunction with machine or device control and includes use of global positioning systems, or GPS.
  • Hanson hails the era of the low-entry Mercedes Econic truck
    July 10, 2018
    UK materials supplier Hanson has taken delivery of the first of 40 low-entry Mercedes Econic cabbed ready-mixed concrete trucks. Hanson said that the low-entry vehicles reflects the company’s ongoing commitment to road safety. The Euro 6-engined trucks have a panoramic glass cab and are fitted with 360° cameras. This, coupled with the lower driving position, says Hanson, significantly improves the driver’s visibility of cyclists and pedestrians, particularly on the near side, according to Hanson. The high
  • Stirling Lloyd launches Bond Coat 3, part of the Eliminator series
    July 7, 2016
    Stirling Lloyd Polychem has introduced a cold, spray-applied bond coat that it says provides enhanced adhesion values and superior in-situ performance Bond Coat 3, part of the Eliminator bridge deck waterproofing system, “represents a significant development” in the provision of tack and bond coats that are used to adhere the asphalt surfacing to the waterproofing. It provides a fast-curing tack-free, durable protective finish that resists contamination and damage from traffic. It removes the risk of