Skip to main content

Evonik helps rumble strips prevent wrong-way driving

Each year in Germany, up to 80 accidents are caused by drivers on the wrong side of the road, of which many are on- and off-ramps to a main highway. To prevent this, a pilot test has been devised to alert drivers to their wrong-way direction. Cold plastic, one-sided rumble strips are being installed on the road surface within a 100cm-wide by 2cm-deep recessed groove across the lane. The specially shaped cold plastic coating with an uneven, rough bulge gives drivers a strong tactile and acoustic signal, aler
December 11, 2015 Read time: 2 mins
Each year in Germany, up to 80 accidents are caused by drivers on the wrong side of the road, of which many are on- and off-ramps to a main highway

To prevent this, a pilot test has been devised to alert drivers to their wrong-way direction. Cold plastic, one-sided rumble strips are being installed on the road surface within a 100cm-wide by 2cm-deep recessed groove across the lane.

The specially shaped cold plastic coating with an uneven, rough bulge gives drivers a strong tactile and acoustic signal, alerting them of the hazard situation. But drivers who are driving in the correct direction will notice only a slight bump in the road.

A prototype was tested on the former military airbase in Rothenburg, a town in Germany’s Upper Lusatia region and close to the Polish border.

A 32m-long test route consisting of five strips was set up. For the diagonal markings, a cold plastic material developed from Limboplast, made by 4009 Evonik Industdries, especially for applying to the grooves in the road surface.

Limboplast for rumble strips is based on 1659 Degaroute from 337 Swarco Limburger Lackfabrik, said Jochen Henkels, business director for road marking and flooring at Evonik.

The hard, abrasion-resistant material will also protect the road surface where the rumble strips are applied and the edges formed by the cutting process against premature wear and tear.

A second test track will soon be set up, he said. It takes three to four hours to install the system that will likely cost around €3,500 for each junction.

For more information on companies in this article

Related Content

  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Sophisticated technology allows milling accuracy
    January 14, 2021
    Given the increase in vehicle numbers and that modern vehicles are heavier, it is more important for modern highways to be constructed to higher standards than previously.
  • Lower noise surfaces under spotlight
    July 31, 2012
    Research is paramount in the development of better roads and safety. In a new series, Eurofile looks at the work and programmes of organisations dedicated to that end. In this issue: The German Federal Research Institute (BASt) The aims of BASt (an arm of the Federal Ministry of Transport) are to improve the cost-effectiveness of building and maintaining federal trunk roads, to increase the safety of road transport, to reduce the environmental impact produced by road traffic and construction and to improve
  • Evolution Road gears up in Lund
    March 25, 2021
    The Swedish electric road group, including Elonroad, will install a flatter version of its system.