Skip to main content

Effective drainage structures

Asset International is now offering HDPE structured wall systems featuring HAPAS accreditation for pipe structures larger than 900mm.
August 28, 2019 Read time: 2 mins
Weholite structures have been awarded HAPAS accreditation: Plastic piping can now be used for large diameter drains and utilities in the UK
Asset International is now offering HDPE structured wall systems featuring HAPAS accreditation for pipe structures larger than 900mm. The water management specialist has received a Highway Authorities’ Product Approval Scheme (HAPAS) accreditation from the British Board of Agrément (BBA) for its Weholite pipes, fittings and systems for sizes from 1000mm to 3500mm.

The accreditation means that Weholite structures are considered suitable and beneficial for use in highways.   

Plastic pipes with an internal diameter greater than 900mm are classed as structures and do not yet have an official technical standard for use in highways. In the past, this might have excluded plastic pipes over 900mm being utilised in highways projects, regardless of the advantages they can offer for applications such as attenuation, surface water drainage and culverts. However, the HAPAS certificate should now help to remove such barriers.

The British Board of Agrément (BBA) has issued HAPAS certificate (18/H283), for this Weholite product group, in recognition of its high performance and reliability. The certification applies specifically to 1000mm to 3500mm diameter Weholite pipes, fittings and systems.

Recognised by key organisations in the highways sector, the HAPAS accreditation supports the fact that Weholite structures are suitable for use in highways and could also derive additional benefits from using them.

According to Asset International, larger diameter plastic pipes and systems can provide better performance, but also offer a range of added benefits. Made from high-density polyethylene (HDPE) resin, Weholite pipes and structures are extremely tough, flexible, and chemically resistant, with a design life in excess of 120 years.

For more information on companies in this article

Related Content

  • Highways: environmental problem or environmental enhancement?
    March 21, 2016
    Highways need not be a blight on the countryside that many people, urban planners included, believe they will always be. By Bram Miller, director, and Martin Broderick, environmental consultant, at Ramboll Environ While the world’s highway networks bring undoubted economic and social benefits, they are generally perceived to lead to negative environmental impacts. Some may consider this an unfair reputation, but it is difficult to argue that in the majority of cases both the construction and operation of
  • New approach needed in Europe to help improve motorcycle safety
    August 22, 2012
    The European Commission is proposing that part of its controversial new Anti-Tampering regulations for motorcycles should be re-written to prevent custom motorcycle builders from using long-forks. This is the latest in a series of requirements in the regulations to attracted criticisms from motorcycle manufacturers, dealers, safety campaigners and enthusiasts groups.
  • Efficient asset management to trim maintenance budgets
    January 22, 2014
    Transport infrastructure is taken for granted in many, if not most, developed countries. This has resulted in a shortage of investment in maintenance, posing potential long term cost issues. In many developing nations transport networks are expanding fast, but insufficient thought is also being given to how these will be maintained.
  • Improved drainage offering from ACO
    February 6, 2020
    ACO has added two new composite edge rails to its Qmax range of large capacity slot drainage systems. The two rails are the Q-Flow and Q-Guard series, the latter coming with Heelguard channel inlet detail, suiting it to use in areas with pedestrian ways. As well as providing a durable and long-lasting surface finish, the new rails are also claimed to aid vertical and horizontal alignment during the laying of long channels runs.