Skip to main content

DynaGate swings into action

The moveable DynaGate system, manufactured to containment level H2, was developed by Swiss road safety manufacturer DynaRoads.
By David Arminas September 20, 2024 Read time: 2 mins
Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source (image courtesy DynaRoads)

Road maintenance in or around the entrance to tunnels and on bridges has specific risks due to the close proximity of workers to live traffic. Even if vehicle speeds are low around worksites, effective lane management is essential for greatly reducing the risk of injury to maintenance staff.

This is also why the moveable DynaGate system, manufactured to containment level H2, was developed by Swiss road safety manufacturer DynaRoads. It literally swings into action to enable traffic to cross over the centre strip, for example in or near tunnels or bridges.

The system comes with a choice of one or two movable barriers. Its modular construction allows the length to be determined by project specifications and also allows for easy maintenance, expansion and replacement of component parts.

The system can be operated in situ from a roadside control cabinet or by onsite workers from a control panel on the system itself. For added convenience, it can be operated also remotely from a traffic control centre.

It has a manual or automatic operating mode. Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source. Time for complete lane alteration is around three minutes.

The solution consists of two central reservation crossings with “wing” barrier sections that open to a length of 94m. The width is 60cm and the height is 84cm while the length can be up to 200m, depending on the client requirements. Only a normal uninterruptible power source, 3x240V is needed for swing operation which can be controlled via the internet.

For added safety, there are mounted onto the gates dimmable LED running lights located at 3m intervals and there is a dimmable LED arrow sign on twistable safety-end of the swinging gate section. Reflector strips, red and white, can run the length of the gate.

For a video of the DynaGate system from DynaRoads, click here.

For more information on companies in this article

Related Content

  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • Innovative low power consumption LED lighting
    February 24, 2012
    Philips has worked in partnership with Gloucestershire Highways to introduce an innovative LED lighting system along the A40 London Road in Cheltenham, leading down to the racecourse.Philips developed the new lighting system in conjunction with Gloucester Highways, providing a solution that would improve road visibility and safety, while reducing energy consumption and maintenance costs. Philips' lighting scheme also worked to the existing spacing pattern in order to reduce installation costs and minimise d
  • Steel wire barriers provide rock fall protection
    February 6, 2012
    In Gibraltar, where the entire population lives on or close to the huge limestone rock that gives the nation its name, the issue of rock fall protection is taken very seriously. Here, a scheme to install a network of rock fall catchment fences has just been completed, which will allow the re-opening of a critically important road at the south-eastern end of the Rock, which was closed following a significant rock fall occurrence in 2002.