Skip to main content

DynaGate swings into action

The moveable DynaGate system, manufactured to containment level H2, was developed by Swiss road safety manufacturer DynaRoads.
By David Arminas September 20, 2024 Read time: 2 mins
Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source (image courtesy DynaRoads)

Road maintenance in or around the entrance to tunnels and on bridges has specific risks due to the close proximity of workers to live traffic. Even if vehicle speeds are low around worksites, effective lane management is essential for greatly reducing the risk of injury to maintenance staff.

This is also why the moveable DynaGate system, manufactured to containment level H2, was developed by Swiss road safety manufacturer DynaRoads. It literally swings into action to enable traffic to cross over the centre strip, for example in or near tunnels or bridges.

The system comes with a choice of one or two movable barriers. Its modular construction allows the length to be determined by project specifications and also allows for easy maintenance, expansion and replacement of component parts.

The system can be operated in situ from a roadside control cabinet or by onsite workers from a control panel on the system itself. For added convenience, it can be operated also remotely from a traffic control centre.

It has a manual or automatic operating mode. Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source. Time for complete lane alteration is around three minutes.

The solution consists of two central reservation crossings with “wing” barrier sections that open to a length of 94m. The width is 60cm and the height is 84cm while the length can be up to 200m, depending on the client requirements. Only a normal uninterruptible power source, 3x240V is needed for swing operation which can be controlled via the internet.

For added safety, there are mounted onto the gates dimmable LED running lights located at 3m intervals and there is a dimmable LED arrow sign on twistable safety-end of the swinging gate section. Reflector strips, red and white, can run the length of the gate.

For a video of the DynaGate system from DynaRoads, click here.

For more information on companies in this article

Related Content

  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.
  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20