Skip to main content

DynaGate swings into action

The moveable DynaGate system, manufactured to containment level H2, was developed by Swiss road safety manufacturer DynaRoads.
By David Arminas September 20, 2024 Read time: 2 mins
Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source (image courtesy DynaRoads)

Road maintenance in or around the entrance to tunnels and on bridges has specific risks due to the close proximity of workers to live traffic. Even if vehicle speeds are low around worksites, effective lane management is essential for greatly reducing the risk of injury to maintenance staff.

This is also why the moveable DynaGate system, manufactured to containment level H2, was developed by Swiss road safety manufacturer DynaRoads. It literally swings into action to enable traffic to cross over the centre strip, for example in or near tunnels or bridges.

The system comes with a choice of one or two movable barriers. Its modular construction allows the length to be determined by project specifications and also allows for easy maintenance, expansion and replacement of component parts.

The system can be operated in situ from a roadside control cabinet or by onsite workers from a control panel on the system itself. For added convenience, it can be operated also remotely from a traffic control centre.

It has a manual or automatic operating mode. Should the power supply be interrupted, DynaGate can be operated in emergency mode with a cordless screwdriver or via an external power source. Time for complete lane alteration is around three minutes.

The solution consists of two central reservation crossings with “wing” barrier sections that open to a length of 94m. The width is 60cm and the height is 84cm while the length can be up to 200m, depending on the client requirements. Only a normal uninterruptible power source, 3x240V is needed for swing operation which can be controlled via the internet.

For added safety, there are mounted onto the gates dimmable LED running lights located at 3m intervals and there is a dimmable LED arrow sign on twistable safety-end of the swinging gate section. Reflector strips, red and white, can run the length of the gate.

For a video of the DynaGate system from DynaRoads, click here.

For more information on companies in this article

Related Content

  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Major advances are being seen in aggregate production technologies
    June 28, 2013
    Recent exhibitions have been launch venues for key developments in aggregate production technologies - Mike Woof reports Efficient production of aggregates is crucial for maintaining cost-effectiveness and also lowering material costs. With contractors owning many of their own quarry operations, these firms understand the benefits of reducing materials costs for their road construction projects. Major developments in the equipment for crushing, screening and washing aggregates are now coming to market and e
  • Reducing congestion while maximising safety in road construction work zones
    April 30, 2015
    Mike Dreznes, executive vice president at the International Road Federation (IRF) discusses road safety for work zone areas. Work zones around the world can create significant congestion and can cost society billions of dollars. Estimates in the United States alone include approximately 87,600 work zone crashes involving 37,500 injuries that result in 482 million lost hours, valued at approximately US$6.5 billion. When considering these numbers worldwide, it becomes clear that work zone safety and work zone